may-mason
Uploaded by
28 SLIDES
484 VIEWS
280LIKES

ENTC 4600

DESCRIPTION

ENTC 4600. Technology Practicum Dr. Hugh Blanton 439-4177 blanton@etsu.edu. Projects. Baby locator ($100,000) DSP Contest ($$$) IEEE Contest ($$$) DSP Circuit Board Love Lamp. Grading. Written Proposal (15%) Oral Proposal Presentation (10%) Status Reports (5%)

1 / 28

Download Presentation

ENTC 4600

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENTC 4600 Technology Practicum Dr. Hugh Blanton 439-4177 blanton@etsu.edu

  2. Projects • Baby locator ($100,000) • DSP Contest ($$$) • IEEE Contest ($$$) • DSP Circuit Board • Love Lamp

  3. Grading • Written Proposal (15%) • Oral Proposal Presentation (10%) • Status Reports (5%) • Final Written Report (15%) • Final Oral Presentation (10%) • Project Check Off (25%) • Difficulty (5%) • Professionalism/Attendance (15%)

  4. Written Proposal Format • Letter of Transmittal • Title Page • Table of Contents • Introduction • Technical Approach (max. 3 pages) • Management Approach (approx. 3-4 pages) • Conclusion (approx. 1 page) • Attachments

  5. Report Content • Reports graded for: • Required content • Spelling, grammar, appearance, etc. (Quality) • all figures, charts, etc. must be computer generated; not hand drawn.

  6. Introduction • Project description • Objectives • Nature of end product • Performance and design specs • Schedule summary • Budget summary (Total cost)

  7. Technical Approach • Alternative technical approaches • Selection criteria • Technology and method to be used • Approach to testing

  8. Management Approach • Project schedule (Gantt Chart) • Tracking chart (team hours) • Responsibility matrix - grid showing who’s responsible for each task • Budget estimate - parts, labor, etc. • Facilities used

  9. Attachments • References • Technical support material • User’s manual(s) • Software • printed source or disk

  10. Oral Presentations • Based on written report • Sign up for time • Bring video tape • “How To” covered in later lecture

  11. Managing Your Project • What needs to be done? (Task list) • Who knows how to do it? • Who will commit to doing it? • When will it be done?

  12. Tasks: What needs to be done • Start date • Duration • Dependencies • Start time • On other tasks • Operate under assumptions • Shows consumption of resources • Time, money, facilities, etc.

  13. Responsibility Matrix:Who is going to do it • List all tasks • Divide tasks among group members • Use member specialization's • Designate one (and only one) person as the primary person for the task. • Include key to decipher matrix (no matter how obvious it may seem).

  14. Responsibility Matrix:Example

  15. Scheduling, Tracking, and Control • Time dependence of tasks • Resource allocation • human, fiscal, facilities • Track measurable quantities • Time, money, parts • In this class, track team time • Module/Subsystem completion

  16. Scheduling • End to End Approach • Takes too long • Run out of resources • Success Oriented • Simultaneous tasking • Filled with risks • Timing is everything

  17. Gantt Chart • List tasks/milestones vs.. time • Show current date • Show status of tasks • When started • Estimate completion • Percentage complete

  18. Gantt Chart Example:Building an RF Tx & Rx

  19. Tracking Chart • Keep track of TEAM hours spent • Example: 1 hour team meeting x 4 people = 4 hrs. • Include any and all hours spent on project related tasks • Meetings, • Writing reports/Preparing oral presentations, • Designing, • Building, • Calling vendors, ...

  20. Tracking Chart Example Team Hours Week

  21. Estimating the BudgetDirect Costs • Labor • Consultant (Instructor) $200/hr. • Lead Engineer $150/hr. • Sr. Eng.. $100/hr. • Jr. Eng.. $50/hr. • Drafting $30/hr. • Clerical $20/hr. • Parts • Hardware breakdown • Software • Misc.. - solder, wires, PCB, packaging, ...

  22. Other Direct Costs • Facilities/Rentals • Equipment (Time) • Labs/Rooms • Misc.. • Phone calls • Travel expenses • Misc. supplies - copies, binding, ...

  23. Indirect Costs • Indirect Costs (overhead) • 100% of direct costs

  24. Performance • Evaluating the options • Options: brainstorming, research, client, … • Criteria: team, client • Form matrix and evaluate numbers

  25. Verification and Validation • Requirements • Functional specs. • Hardware/Software specs. • Test specs. • Subsystems and complete system • Delivery of product • Report • Hardware/Software

  26. Status Reports • Group name/Member names • Project/Solution summary • Tasks scheduled to be completed soon • Tasks to be started before next report • Problems (new or ongoing) and solutions • Current Gantt chart • Current tracking chart • Conclusion - Impact on CSP