An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wednesday 4th May 05/05/2011 • UPS problem point 5 – no beams since Tuesday 2 pm • (External) Experts replaced UPS in point 5 by smaller spare • Putting ‘spare parts’ back at point 4 • 16:00 UPS systems back • 12:00 - In parallel - ATS optics check without beam and 2 sectors in simulation mode • Finish 16:15 • Followed by pre-cycle – BPM off-set MD starting later • 18:30 first beams injected – BPM off-set MD really started • RQTF.A23B1 trips due to a water fault -> needed for ramp • 0:00 TCDQ/TDI alignment MD • 04:00 SPS injection kicker oil level problem • 06:00 Decided to mask IL, beam back – but MD over • Thu 6:30 prepare for access for RQT water fault • Access over by about now • Pre-cycle and continue MD: RF single bunch instabilities • Expect beam around 9:30 LHC 8:30 meeting

  2. ATS MD SR, SF, MGi, GM, RdM, WVD • Dry test of the ATS optics, with sectors 45 and 56 in simulations (UPS problem) • Standard precycle + drive to ATS injection settings - Check of new knobs (tune, chroma, sep, crossing) at injection - Ramp of power converter settings - Ramp of the RF parameters - Check of knobs at top energy • Found a number of small issues with the settings but they were all easily solved. Still to be followed up before the tests with beam: • definition of IP knobs in IP5 and IP8 uses PCS not available. They ahve to be removed from the knob definition; • chromaticity decay to be added onto the flat-top decay plateau. • Overall: dry tests very successful! LHC 8:30 meeting