An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERCOT 2011 Five-Year Transmission Plan Update RPG Meeting

  2. 2011 Five-Year Transmission Plan 2011 5YTP Scope and Process SSWG 11DSB Cases : April TPIT Update Match SSWG Cases to TPIT updates Conditioned cases Start Cases (Powerworld) SSWG Contingencies Generation Cost Data Posted on website Reliability Analysis (on-going) RPG Meeting

  3. 2011 5YTP Status • Start Cases • POI site for 5YTP: http://planning.ercot.com/planning/near/fiveyr/ • Conditioned cases posted on POI site in August • (starting point for reliability analysis) • Changes to conditioned cases to become start cases • Wind units Pmax set to 10% of original value • Added generation with signed IA that do not already appear in SSWG cases • Input cost information for each generator • Contingencies loaded into cases • Flat loads are set and other loads are scaled accordingly by weather zone • (see next slide for detail) RPG Meeting

  4. 2011 5YTP Status • Load Information • Evaluated load by weather zone • In some cases ERCOT econometric forecast was higher than SSWG forecast • For reliability analysis 5YTP cases will use higher of SSWG or ERCOT forecast (highlighted in tables below) RPG Meeting

  5. 2011 5YTP Status • Summary of Start Cases • Reserve margins are tight due to conservative demand assumptions • Analysis split into 2 regions for 2016 (based on weather zones) with base case created for each region • North/ North Central/ West/ Far West • South/ South Central/ East/ Coast • Mothball Generation activated in 2014 and 2016 cases • High cost of generation means little participation • Mothball units de-activated in each individual zone during reliability analysis of that zone • Table below summarizes the cases with these changes to load and generation RPG Meeting

  6. 2011 5YTP Reliability Analysis • Reliability Analysis & Initial Observations • SCOPF & CA completed for start cases (2012, 2014 & 2016) • Initial set of reliability projects identified based on the 2010 5YTP reliability projects • Next Steps • Perform SCOPF and CA with the initial set of projects (studies on-going)and post cases/results for comment • Meet with Transmission Owners to discuss results (in the next two weeks) • Perform G-1 + N-1analysis • Perform project back-out to validate results • Determine final set of projects and complete Reliability analysis (target Nov.1) RPG Meeting

  7. Questions? RPG Meeting