An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERCOT 2012 Five-Year Transmission Plan Update RPG Meeting

  2. 2012 Five-Year Transmission Plan 2012 5YTP Scope and Process Match SSWG Cases to TPIT updates (June)/ Remove non- RPG projects SSWG Contingencies Generation Cost Data SSWG 12DSB Cases : May Update Conditioned cases Start Cases (Powerworld) Reliability Analysis (on-going) Posted at the POI on June 14 Posted at the POI on July 5 RPG Meeting

  3. 2012 5YTP Start cases summary • Summary of Start Cases • Reserve margins are tight due to 90th percentile load • Analysis split into 2 regions for 2013, 2015 and 2017 (based on weather zones) with base case created for each region • North/ North Central/ West/ Far West • South/ South Central/ East/ Coast • Mothball Generation activated in 2015 and 2017 cases • Mothball units de-activated in each individual zone during reliability analysis of that zone • Table below summarizes the cases with these changes to load and generation RPG Meeting

  4. 2012 5YTP Reliability Analysis • Start Cases & Reliability Analysis • Updated start cases (2013, 2015 & 2017) posted at the POI on July 5th • SCOPF & CA completed for start cases (2013, 2015 & 2017) • Reliability analysis results for the start cases sent to the TO’s on July 6th • Next Steps • Work with Transmission Owners to review start case results (in the next three weeks) • Perform Reliability analysis to identify initial reliability projects for N-1 • Perform G-1 & N-1analysis • Perform project back-out to validate results • Determine final set of projects and complete Reliability analysis (target Sept.3) RPG Meeting

  5. 2012 5YTP Schedule 2012 5YTP Schedule/timeline: Posted at the POI site : http://planning.ercot.com/planning/near/fiveyr/ RPG Meeting

  6. Questions? RPG Meeting