1 / 20

WELCOME TO CLEARTITLE PROPERTIES

WELCOME TO CLEARTITLE PROPERTIES. Details of godown space at ORR. Total area – 1,02,500sft Property – Kirby warehouse Height – 36” Parking – 50,000sft. VIEW FROM ORR. ENTRANCE FROM ORR. LEFT SIDE VIEW. RIGHT SIDE VIEW. BACK VIEW. BACK SPACE. INSIDE VIEW. INSIDE VIEW.

marty
Download Presentation

WELCOME TO CLEARTITLE PROPERTIES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME TO CLEARTITLE PROPERTIES

  2. Details of godown space at ORR • Total area – 1,02,500sft • Property – Kirby warehouse • Height – 36” • Parking – 50,000sft

  3. VIEW FROM ORR

  4. ENTRANCE FROM ORR

  5. LEFT SIDE VIEW

  6. RIGHT SIDE VIEW

  7. BACK VIEW

  8. BACK SPACE

  9. INSIDE VIEW

  10. INSIDE VIEW

  11. CHANGING ROOM AND TRANSFORMER

  12. FRONT VIEW

  13. PARKING

  14. PARKING

  15. SIDE SPACE

  16. Ware-House Features:

  17. Ware Houses Details - Projects Includes: a) Prefabricated Building Technology using Kirby make structures. b) Wide spans. c) Re-in forced floors for moment of fork lifts etc. d) Warehouse of about 1, 02, 500sft with 50% space for truck parking & roads. e) Toilets and washing facilities. f) Provision for running water. g) Complete fencing and compound of the area. h) Rat-proof structures. i) Sky- Lighting and Ridge Ventilators on structures. k) Loading and unloading bay with canopy. l) Inner / Outer wide roads. m) Greenery in surroundings. n) Earth quake resistant construction. o) Close to the proposed inland container depot and CWC ware house. P) Close to outer ring road exit. Q) 24 Hrs Water Supply Available in The Premises. R) Special Fans According to the Norms for Warehouses.

  18. Ware House Site visit Discussion Points: Slight modifications and alternations can be made as project is under implementation scheme to suit your requirements.

  19. THANK YOU FOR CONTACTING US For further enquiry please feel free to contact us at: 9966010378 9885531337 9246337425 Our Email ID: ctp.hyd@hotmail.com

More Related