Gamma-ray Large Area Space Telescope
Download
1 / 15

GLAST Large Area Telescope: Stato della costruzione in Italia Alessandro Brez INFN Pisa - PowerPoint PPT Presentation


  • 91 Views
  • Uploaded on

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope: Stato della costruzione in Italia Alessandro Brez INFN Pisa. Stato della torre EM. La torre EM e’ rimasta assemblata per evitare di danneggiare i fragili cavi smontandoli e rimontandoli

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'GLAST Large Area Telescope: Stato della costruzione in Italia Alessandro Brez INFN Pisa' - margot


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Gamma-ray Large Area Space Telescope

GLAST Large Area Telescope:

Stato della costruzione in Italia

Alessandro Brez

INFN Pisa


Stato della torre em
Stato della torre EM

  • La torre EM e’ rimasta assemblata per evitare di danneggiare i fragili cavi smontandoli e rimontandoli

  • Questo ha impedito il test dei tray in camera termica e il completamento dell’ incapsulazione delle microsaldature fra ladder e tray (solo 4 tray sono completi)

  • Il tempo rimasto fra test vibrazionale e test termovuoto non permette di effettuare queste ciclature

  • La Plyform ha il materiale per assemblare le nuove sidewalls che saranno pronte entro 2 settimane, in tempo per il test previsto per il 17/11.

  • In produzione sono:

  • Tavola di interfaccia shaker verticale – fixture torre (Pisa)

  • Tavola di interfaccia camera termovuoto - fixture torre (Pisa)

  • Nuova fixture (SLAC)

  • Nuovo frame salva-cavi (SLAC)


Assembly of em tower in g a
Assembly of EM Tower in G&A

Trays alignment onassembly jig

Cabling

Geometrical tolerances well within limits (0.3 mm).


Attivita flight in corso
Attivita’ flight in corso

  • Ricevimento e test SSD

  • Produzione ladders in G&A

  • Start produzione trays in Plyform


Ssd electrical test rate
SSD Electrical Test Rate

Received :9452 (82% del totale, ultimi 2000 in ordine dall’ASI)

Tested: 8388 (89% dei ricevuti, 73% del totale)

Rejected ~1%


Ssd electrical properties
SSD Electrical Properties

Specification: leakage current <500 nA at 25C and 150 V


Produzione ladders
Produzione Ladders

690 flight ladder tested (25% of total)

15 rejected (2.2%)

Ladder assembly tool

Manual fast AND precise method

24 ladder assembly tools used in parallel

Very good ladder alignment obtained


Encapsulation
Encapsulation

  • Dam & Fill encapsulation

  • Dam Nusil 1142

  • Fill Nusil 15-2500

  • Requirements:

  • Height <0.5mm

  • Lateral overflow <0.05mm

  • Coverage of all the bondings and pads

Fast system to check encapsulation height


Electrical tests results
Electrical Tests: Results

  • Electrical test results:

  • Ladder tested 690

  • Accepted 675 (98%)

  • Broken edge 4

  • Probe accident 2

  • Fill accident 1

  • Not understood 8

  • The causes of problems 3, 4 and 5 have been corrected, foreseen rejection rate ∼1%

Bad channels caused by bonding or by probing (coupling shorts)=0.016% (accepted limit 1%)

No broken or bad bondings






  • Stato costruzione dei tray

  • Incoming materiali in corso :

  • problemi su qualita’ honeycomb

  • Problemi su prima serie di CC (yeld 75% su 40)

  • Taglio tungsteni 18%Xo

  • Previsione: primi tray sotto test vibrazionale e bakeout a dicembre

4mm


Programma a breve
Programma a breve

  • Produzione di 10-20 tray entro dicembre (con test vibrazionale e bakeout)

  • Produzione tray a ritmo di 10 tray/settimana per gennaio

  • Ricevimento di ~20 elettroniche con meccanica (pitch adapter) migliorata ma GTRC-6 (TOT e Clock problems) entro novembre

  • Assemblaggio di 5 trays con ladder funzionanti per costruzione di minitower #2 entro dicembre

  • Gennaio-marzo test estensivi minitower:

  • Test con cosmici in configurazione minitower e su rack di test

  • Test termico passivo

  • Test termovuoto attivo

  • Test vibrazionale

  • In parallelo

  • Assemblaggio dei ladder sui tray

  • ~marzo MCM con GTRC7  inizio produzione torre A