slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Innovation PowerPoint Presentation
Download Presentation
Innovation

Loading in 2 Seconds...

play fullscreen
1 / 16

Innovation - PowerPoint PPT Presentation


  • 81 Views
  • Uploaded on

Innovation. The purpose of the program is to use the fluctuations in the Earth and convert it to the Electric Energy. Our technology will be capable to supply constantly electric energy, with limited cost of maintenance. No pollution No costly maintenance No costly initial setup.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Innovation' - marcin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
innovation
Innovation
  • The purpose of the program is to use the fluctuations in the Earth and convert it to the Electric Energy.
  • Our technology will be capable to supply constantly electric energy, with limited cost of maintenance.
  • No pollution
  • No costly maintenance
  • No costly initial setup

Confidential, Do Not Distribute

description of the technology
Description of the Technology

We estimate : 10m² = 1KWatt

Our technology is allowing us to use a very small space and still reach to large amount of MWatt

The shell of the earth is rapidly fluctuate (microns)

There are the materials that when you press on them, potential difference is created, like quartz or composite.

With our technology we can convert these fluctuations into the electric energy.

Confidential, Do Not Distribute

why we
Why We?

Photo – Voltaic ROI is 6-10 years. After 7 years you have to reinstall most of the silicon cells. Amount of sun hours is limited.

Cost of the installation is 1.5-2.5 million Euro for 1MgW/h.

Our Technology

  • Don’t have to reinstall any parts.
  • Amount of work hours is 24/7.
  • Cost of the installation up to 1.5M Euro for 1MgW/h.(depends on structure and cost of the land)
  • ROI is SMALLER – up to 3 years.

Confidential, Do Not Distribute

advantages
Advantages

Our technology contributes to improving the security of Europe's energy supply

Confidential, Do Not Distribute

program is in 4 phases
Program is in 4 Phases
  • Phase 1 – producing scheme – 1000 watt
  • Phase 2 – pilot version 100 Kwatt.
  • Phase 3 – production 1MgW.
  • Phase 4 – production 5-100 MgW.

Confidential, Do Not Distribute

Confidential, Do Not Distribute

phase 1
Phase 1
  • Development of a laboratory prototype , producing and storing energy: 1, 10, 100, 1000 WATTS.
  • Objective – Developing a basic scheme and producing and storing electric energy.
  • Time : 1-2 years
  • Personal : 7 people.
  • Money needed : 1.5-3 Million Euros.

Confidential, Do Not Distribute

phase 1 steps
Phase 1 - Steps
  • Building laboratory, hiring people
  • Selecting the source of oscillations - electrical, mechanical, hydraulic, magnetic ...
  • Selection of the principle of converting vibration - piezo, magnetic, ...
  • Selecting the connection method of the system
  • Selecting the method of accumulation of finished energy (batteries, dry cells and so on)
  • Selecting materials for energy conversion, for example : natural (quartz), artificial (composite)
  • Choosing the materials for energy transfer: metal, semiconductor,…

Confidential, Do Not Distribute

phase 1 steps1
Phase 1 – Steps
  • Development of a test design product for testing schemes (schemes).
    • Selecting devices
    • Choosing accessories
    • Making drawings
    • Manufacturing, assembly and choosing stand
  • Testing. Objective - to check the various circuit elements and their interaction.
  • Finalization of the scheme for pilot.

Confidential, Do Not Distribute

phase 2
Phase 2
  • Development of pilot plants for electric energy storage and production: 10 - 100 kWatts.
  • Objective – Developing a pilot version and producing and storing electric energy.
  • Time: Up to 1-2.5 years.
  • Personal: 8
  • Money needed: 1.5-3.5 Million Euros.

Confidential, Do Not Distribute

phase 2 steps
Phase 2 – Steps
  • Selecting the location :
    • Collection of geophysical and geo-mechanical data.
    • Collection of archaeological data.
  • Development of the design of the construction.
    • Selection of the technological scheme.
    • Selection of the control circuit.
    • Selection of the basic equipment.
    • Selection of the accessories.
    • Selection of the devices.
    • Creation of the drawings.

Confidential, Do Not Distribute

phase 2 steps1
Phase 2 – Steps
  • Production Setup
    • Manufacturing the parts of the installation.
    • Building the installation, including the adaptation.
    • Conducting pilot tests.
      • Objective – collection the data for development of a pilot plant for energy storage and production : 1 - 100 MgW.

Confidential, Do Not Distribute

phase 3 production
Phase 3 – Production
  • Production of 1 MgWatt

Phase 4 – Production

  • Production of 5-100 MgWatt

Confidential, Do Not Distribute

Confidential, Do Not Distribute

slide14

Status of the Project

  • Ready - Theoretical Model of working system (Algorithms, Mathematics, Formulas, Sketches)

Algorithms

Formulas

Mathematics

Sketches

Confidential, Do Not Distribute

slide15
Team
  • Abramov Alex – Project Leader. 33 years old. Alex has an extensive knowledge in project management and company Business development. Alex now is managing director of Gazit Technologies, a start up company that sold it’s product and now acting as an outsourcing company in web development.http://www.linkedin.com/in/enigmatec
  • Shamuilov Boris – PhD in Physics and Chemistry. 59 years old. Boris has an extensive knowledge in R&D. Boris has 25 patents registered on him and on the group that it was developed.

Confidential, Do Not Distribute

thank you
Thank you

Contact us

Alex Abramov

Tel : +972 52 6408850

abramovalex@gmail.com

Confidential, Do Not Distribute