Improving Child Defibrillation Protocols: Research and Innovations
170 likes | 309 Views
Current medical protocols for defibrillating children under twelve are insufficient due to a lack of research on how electrical currents interact with a child's anatomy and physiology. This project aims to investigate the impact of body size on electrical current distribution, demonstrating unsafe levels of shock when using adult defibrillators. Additionally, the research seeks to redesign defibrillators tailored for children's body sizes. By employing Finite Difference Frequency Domain modeling in MATLAB, we aim to enhance Advanced Life Support (ALS) outcomes for pediatric patients.
Improving Child Defibrillation Protocols: Research and Innovations
E N D
Presentation Transcript
Child Defibrillation By Todd Braithwaite
Introduction Modern Medicine has not yet created protocols for successfully defibrillating children under twelve years old. There is a lack of research on how electrical currents affect the anatomy and physiology of a child’s body. Adequate research on this subject could improve the outcomes of advanced lifesaving (ALS) measures for children.
Goals - First • Demonstrate effects of body size on current distributions in body • Expect to find dangerous levels in child body with adult shock • Publish findings
Goals - Second • Redesign defibrillator for child body size • Expect to change strength & duration of shock • Publish findings
Cardiac Defibrillation - Basics • Heart controlled by electrical signals • Fibrillation - rapid & irregular beating of the heart • Electrical shock used to restore regular heart beat (defibrillation)
Defibrillation Basics - cont’d • Paddles (electrodes) placed on body • Electrical shock applied • View results • Repeat if necessary Note Too big of a shock will permanently damage the body tissue
Defibrillator • Lifepak 500 Automated External Defibrillator http://www.lifesaving.com/catalog/emsresus.htm
Usage of Defibrillator • Location of Electrodes
My Project • Model current distribution in body • Finite Difference Frequency Domain (FDFD) Modeling • Written in MATLAB
Model of Human Body • No model of child body • Adult body model • Scale to child size
MATLAB • FDFD code written in house • Successive Over Relaxation (SOR) method • Resolution (matrix size) determined by computing power available
MATLAB -cont’d • Results compared against published current patterns
Project Timeline • Working FDFD code - May 1, 2000 • Human model - May 28, 2000 • Preliminary results - June 27, 2000 • Simulations completed - July 30, 2000 • Write up completed - August 15, 2000
Close • Defibrillators designed for adults • Lack of research on defibrillating children • Future design changes in defibrillators
Resources • Dr. Furse • Articles - 2 so far • Web sites - none yet