An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting September 09, 2013

  2. Accelerator Operation Summary From : September 02, 2013 (0000 hours) To: September 09, 2013 (0000 hours) Calendar Week # 36 NuMI Weekly Integrated Intensity 1.46 E18 protons BNB Weekly Integrated Intensity 0.0 protons NMuonWeekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 0.0 protons Beam Hours To NuMI ~96.00 hours

  3. Status /Work Completed/Plans • Proton Source • Tuning & Studies • Main Injector • MI8 line lattice measurements • Analyzing Data • Tune Calibration Done • Aperture scans (ring) • Looking at data, will repeat or perform a more detailed scan at questionable locations • SY120 set up • NuMI • Running, increasing intensity • Switchyard • Scanning harmonic quadrupole settings • Establishing QXR operation • New operating point does not properly extract at MI52 • Need to investigate and understand or return to old settings • MTest • Experiment Ready • NMuon • Berm pipe installed • Can see light through pipe

  4. Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html