Common Methodology Group Work. Workstream 2 DRM and cost allocation methodology. PRESENTED BY María Isabel Liendo on behalf of Workstream 2. energynetworks.org. Summary. Last meeting 24 th August 42 meetings, 293 actions (!) 1 consultation on reactive charging

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Common Methodology Group Work' - makan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
common methodology group work

Common Methodology Group Work

Workstream 2

DRM and cost allocation methodology

PRESENTED BY María Isabel Liendo on behalf of Workstream 2

energynetworks.org

energynetworks.org

summary
Summary

Last meeting 24th August

42 meetings, 293 actions (!)

1 consultation on reactive charging

“General” consultation on CDCM (together with WS3)

Stakeholder workshop after the general consultation was published

IDNO/DNO billing consultation

energynetworks.org

energynetworks.org

2

delivered
Delivered

CDCM model for tariff calculation

IDNO model for calculating a discount to ATW tariffs

Methodology statement

User Manual

(Internal) guidance documents for DNOs for population of the models

energynetworks.org

energynetworks.org

3

next steps
Next Steps…

Most of WS2 work has been closed

IDNO/DNO work transferred back to Ofgem chaired group and DCUSA working group

Potentially some work under WS2 to look at some commonality issues