Proposal of strategic task force making requirements to smart grid and lvdc
Download
1 / 7

Proposal of Strategic Task Force - Making requirements to Smart Grid and LVDC - - PowerPoint PPT Presentation


  • 76 Views
  • Uploaded on

Proposal of Strategic Task Force - Making requirements to Smart Grid and LVDC -. Norimasa Minami Assistant secretary and TA9 Technical secretary. 2010-5-18. Contents 1, Current activities in IEC high level committees 1) SMB/SG1 ( Electrical Energy Efficiency)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Proposal of Strategic Task Force - Making requirements to Smart Grid and LVDC -' - maj


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Proposal of strategic task force making requirements to smart grid and lvdc

Proposal of Strategic Task Force- Making requirements to Smart Grid and LVDC -

Norimasa Minami

Assistant secretary and TA9 Technical secretary

2010-5-18


Proposal of strategic task force making requirements to smart grid and lvdc

Contents

1, Current activities in IEC high level committees

1) SMB/SG1 (Electrical Energy Efficiency)

2) SMB/SG2 (Ultra High Voltage)

3) SMB/SG3 (Smart Grid)

4) SMB/SG4 (Low Voltage Direct Current)

5) MSB/SWG

2, Scope in IEC

3, Impacts to TC100

1) Smart Grid

2) LVDC

3, About ad-hoc group

1) Objectives

2) Goal

3) Timeline

4) Members


Proposal of strategic task force making requirements to smart grid and lvdc

1, Current activities in IEC high level committees

1) SMB/SG1 (Electrical Energy Efficiency)

Created the below SGs

2) SMB/SG2 (UHV)

Ultra high voltage transmission among the grids

No impactto TC100

3) SMB/SG3 (Smart Grid)

TC100 products are using electricity

Impact to TC100 about from/to in-home, such as HEMS

4) SMB/SG4 (LVDC)

TC100 products are driven by DC in its hardware

Direct current inside home, not transmission outside

5) MSB/SWG

EEE report mentioned new energy technologies

In the future may be discussed


Proposal of strategic task force making requirements to smart grid and lvdc

Generator

Transmission

Distribution

In-home

Generation

2, Scope in IEC

Should be discussed on a sectoral basis

network

PV

HVAC

Data Centre

A/V equipment

Distribution Panel

network

Energy Management

LVDC

Substation

Heat Pump

Residential

Battery

FC

Fridge

EV


Proposal of strategic task force making requirements to smart grid and lvdc

Air-conditioner

Refrigerator

Washing Machine

Transformer

Power Station

heat pump

AC 100-200V

Microwave Oven

AC 50/60Hz

Induction Heater

Storage Cell

TV

DVD/BD

Audio Set

LVDC

24~48V

Photovoltaic

PC

Printer

GameMachinei

Phone/Fax

Hybrid Control

LED Lighting

Sensorー

Ventilation

DC PLC

Wireless Charger

Electric Toothbrush

Heat pump

FC

Bath

Hydrogen

Electric Shaver

Kitchen

Waste heated water

Wash-basin

3, Impacts to TC100

1) Smart Grid (SG3)

Electrical using equipments, HEMS, Smart meter, etc

Energy Architecture in home (MSB-SWG report)


Proposal of strategic task force making requirements to smart grid and lvdc

2) LVDC (SG4)

All most of TC100 products are using DC

Unification of voltage, plug, wall socket, wiring, accessories, etc


Proposal of strategic task force making requirements to smart grid and lvdc

  • 4, About a proposed task force(s)

  • Objectives

  • Survey and discussions of requirements to Smart Grid, LVDC

  • ex. Interfaces, Protocol, Voltage, and Safety issues

  • 2) Goal

  • Establishment of projects to make a standard related TC100

  • 3) Timeline

  • 1st step : - December, 2010

  • Survey the impact to TC100 by Smart Grid

  • 2nd step : 2011- depend on the SMB decisions in October

  • Discussions and making requirements to related TCs

  • Making standards related TC100

  • 4) Members

  • Request to resister experts