CERN’s MidTermPlan and the consequences for  HIE-ISOLDE

Loading in 2 Seconds...

play fullscreen
1 / 10

CERN’s MidTermPlan and the consequences for  HIE-ISOLDE - PowerPoint PPT Presentation


  • 140 Views
  • Uploaded on

CERN’s MidTermPlan and the consequences for  HIE-ISOLDE. Yacine Kadi on behalf of the HIE-ISOLDE project team ISCC, 4 November 2010. Outline. Project Status M&P Budgets New Planning Summary. Project Status. New website in place http://hie-isolde.web.cern.ch

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CERN’s MidTermPlan and the consequences for  HIE-ISOLDE' - madonna-murphy


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
cern s midtermplan and the consequences for hie isolde

CERN’s MidTermPlan and the consequences for  HIE-ISOLDE

Yacine Kadi on behalf of the HIE-ISOLDE project team

ISCC, 4 November 2010

outline
Outline
  • Project Status
  • M&P Budgets
  • New Planning
  • Summary

November 4, 2010 | ISCC | Yacine Kadi | 2

project status
Project Status
  • New website in place http://hie-isolde.web.cern.ch
  • Project included in MTP 2010 – Approved by Council -> Sep. 2010
        • Planning shift
        • Revised budget/resources
  • CATHI being signed
        • Start Nov.1 2010
        • Fellows by Jan. 2011
  • Submission of Spanish Grant proposal
        • 3 projects within “Industry for Science” => 350 k€, 6FTE
        • MiCINN project => 998 k€, 1FTE
  • New Cavity RF tests taking place @ SM18
  • 2nd prototype cavity (slightly modified) in fabrication
  • New layout of the facility

November 4, 2010 | ISCC | Yacine Kadi | 3

material budget
Material Budget

Total remaining material budget of 35.3 MCHF shared between(2010 – 2016):

  • External funding
    • LINAC (17.7 MCHF)
  • CERN budget
    • Infrastructure (14.7 MCHF)
    • Design studies for intensity upgrade (2.1 MCHF)
    • Safety (0.8 MCHF)

November 4, 2010 | ISCC | Yacine Kadi | 4

material budget1
Material Budget

November 4, 2010 | ISCC | Yacine Kadi | 5

personnel budget
Personnel budget
  • CERN Staff
    • Resources defined by group leaders (105 FTE over 5 years)
  • Fellows (70 FTE)
    • 5 FTE paid on departmental budget
    • 9 FTE paid by Isolde Collaboration
    • 56 FTE paid by ITN3 Marie Curie Contract (20 fellows)

November 4, 2010 | ISCC | Yacine Kadi | 6

fellows paid on t131910
Fellows paid on T131910
  • Mathew FRASER (PhD, BE/RF) : 3917 CHF/month (100%) -> beam  dynamics
  • Francesca ZOCCA (fellow, BE/BI): 2000 CHF/month on top of  Spanish salary (100%)-> beam instrumentation
  • Mathieu THERASSE (fellow, BE/RF): 9000 CHF/month (50% in 2010) - SC cavity RF
  • Yuriy ROMANETS (UPAS from ITN Lisbon, EN/STI): 4128 CHF/month  (100%) -> radioprotection (from July)
  • Yann LECLERQ (fellow, TE/MSC): 9000 CHF/month from August 2010  (100%) -> cryomodule design

November 4, 2010 | ISCC | Yacine Kadi | 7

cathi open positions
CATHI Open Positions
  • ESR2: Cavity and Cryomodule tests
  • ESR4: New Magnet
  • ESR5: Development and participation to the integration studies
  • ESR6: Development and participation to the control, alignment and positioning metrology
  • ESR8: Target material studies
  • ESR13:Cooling and Ventilation Design Study
  • ESR14:Design study of the vacuum system for the Front End of the Isolde facility
  • ER3: Design study of a replacement charge breeder for REXEBIS

November 4, 2010 | ISCC | Yacine Kadi | 8

hie isolde schedule
HIE-ISOLDE Schedule

PSB SHUTDOWN

Physics @ 5.5 A MeV

Physics @ 10 A MeV

November 4, 2010 | ISCC | Yacine Kadi | 9

summary
Summary
  • SC Cavity prototype cold tests @ SM18
  • New SC cavity with modified design for sputtering tests
  • Cryostat design well underway
  • Radiation protection calculations ongoing
  • Tendering —> Civil Engineering (Mar. 2011 FC) Cryogenics (Mar. 2011 FC)

November 4, 2010 | ISCC | Yacine Kadi | 10