Painting FAI / LAI Inspection 9/29/06 rev.2. Team Members Shane Wilson Stella Huang Karl Lu Henry Cheng. Objective. Verify the consistency of painting quality during mass production by FAI (First Article Inspection) and LAI (Last Article Inspection). Definition. First Article

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Painting FAI / LAI Inspection 9/29/06 rev.2' - madonna-finley


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
painting fai lai inspection 9 29 06 rev 2

Painting FAI / LAI Inspection 9/29/06 rev.2

Team Members

Shane Wilson

Stella Huang

Karl Lu

Henry Cheng

objective
Objective

Verify the consistency of painting quality during mass production by FAI (First Article Inspection) and LAI (Last Article Inspection)

definition
Definition

First Article

The 1st part under mass production condition when

  • Start a new production run
  • Raw material added to the production line. Example would be adding new pot of paint to paint line due to viscosity or exceeded pot life.
  • Process parameter adjustment
  • Recovery production after an hour or longer shut down

Purpose

  • The FAI will approve the process for mass production
definition1
Definition

Last Article

The last part of a particular production run, for example

  • End of a production order
  • Before raw material added to production line
  • Temporary production shut down

Purpose

  • The LAI will approve the parts for shipment to the next integration location.
  • The LAI sample will also be used for IQC purposes when shipped to the ODM.
sub tier actions required
Sub-Tier Actions Required
  • Documented the procedure of FAI/LAI.
    • 5W1H
    • FAI/LAI sample identification
    • Traceability between FAI/LAI and products
    • Ensure the products are not moved to next station before LAI be approved
    • Recall method whenever nonconformance and/or failures are found
  • This process will be used on all cosmetically painted, plated or ink transfer parts.
  • Normal in-process samples will be pulled and tested as defined by PMP
  • LAI will be placed in the shipment to the ODM to be used for IQC acceptance.
  • Due Date: 18th Oct
odm action required
ODM Action Required
  • Review and approve sub-tiers FAI/LAI procedure
  • Make sure the procedure are followed by sub-tier
  • Verify LAI sample in IQC
  • ODM will still be responsible to pull a random sample as defined in their PMP and perform the same testing for Color, Gloss & 85FMR compliance.
  • Feedback to GCQM & Sustain GSQM the plan no later than 20th Oct, and approve by Dell SEQ.

Retention Period

  • ODM will retain the LAI sample for a minimum of 90 days at their factory
  • Odm will retain the Drop Shipment LAI for a minimum or 90 days at their factory
slide7

An Example of FAI/LAI Identification

Paint Lot

Production lot no.

Line

FAI/LAI

identification

  • Note:
  • Paint Lot: means the paint supplier lot number;
  • Production lot no.: It is paint applicator lot no, which can trace back to the production date, the specific lot no of that day;
  • Line: It is the parts production line identification of applicator production line;
  • FAI/LAI identification: Just put the identification mark, thus, FAI or LAI can be identified easily;
  • Sub-tier one shipping lot may include N production lots, thus, there is N LAI need to attached.
  • Sub-tier may follow above rule for labeling or another way, but above information should be included.