1 / 4

IPM and FW Update

IPM and FW Update. 3/4/2009. Mulitbatch Partial or Missing Profile.

lyle-holman
Download Presentation

IPM and FW Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IPM and FW Update 3/4/2009

  2. Mulitbatch Partial or Missing Profile • Tuesday Feb 10 -the 2nd bunch was being injected while the wire was flying. This would often show up as the first pass of data being taken prior to the 2nd bunch being injected. We delayed the start of the fly by .05 seconds. The 2nd bunch now shows up consistently on the horizontal wire data.

  3. Second Bunch Not Yet Injected Wire Speed and IBeam

  4. Integrator Mods Tue Mar 3 14:09:21-  The Main Injector Flying Wire Integrator hold time was decreased to 100ns from 200ns on the Horizontal and Vertical Proton Integrators today. This should help reset the integrator more completely between the 2 batches on multi-batch proton injection. 6862_09030412:48:18_0 6855_09030307:10:36_0 6855_090303_07:10:36_1 6862_09030412:48:18_1

More Related