250 likes | 400 Views
CLIC TBM Prototype T0@CLEX Integration. Inventory. Planning Report - March 2014. Dmitry Gudkov. CONTENTS. 2D layout Inputs Supporting elements for CLEX components in the working area Integration Inventory Integration of TBM and modification of CLEX components. Drive beam
E N D
CLIC TBM Prototype T0@CLEX Integration. Inventory. Planning Report - March 2014 Dmitry Gudkov
CONTENTS • 2D layout • Inputs • Supporting elements for CLEX components in the working area • Integration • Inventory • Integration of TBM and modification of CLEX components. Drive beam • Integration of TBM and modification of CLEX components. Probe beam • Inventory of the CLEX components (working area, preliminary) • Status of components production for TBM • Planning for the TBM installation in CLEX • Documentation
TBM Prototype T0@CLEX. 2D Layout. Phase 1 2D layout is based on one presented by Igor on 3.04.2013 LINK • 1 PETS and 1 SAS will be powered; • VGVs are installed on each extremity to detach the test stand; • Engineering design and integration of primary RF network is required. Module border Module border
INPUTS. Integration of TBM. Probe beam 3D model is based on the document prepared by Wilfrid Farabolini: EDMS 1366387 Are implemented in the drawing CLIATCIN0005 (under way):
INPUTS. Integration of TBM. Drive beam Positions of the quadrupoles, input from Jacob Esberg: EDMS 1366388 Are implemented in the drawing CLIATCIN0005 (under way):
TBM implantation in CLEX storage
TBM implantation in CLEX ~14 meters
TBM supporting benches (24 holes to be drilled for installation) 2 Feet to be reused in different place (8 holes to be drilled) New girders (x3) Supporting Elements for TBM and CLEX Components • All green feet will not be moved • Green girders will be moved by several cm.
Installation of the components of the TBM + alignment control
Status of components. CLEX working area Cooling pipe
Resources Cooling system: final integration is under way by Vadim Soldatov and Alexios Lorens Vamvakas Installation: FSU108, Andrey Olyunin, Wilfrid Farabolini (CLEX equipment coordination) Vacuum for CLEX: Esa Antero Paju Fiducialization, alignment: ABP-SU Special tasks: external companies or other groups of CERN are involved
Documentation • EDMS 1366387 – INPUT. Integration of TBM in CLEX. Probe beam • EDMS 1366388 – INPUT. Integration of TBM in CLEX. Drive beam • CLIATCIN0004 (under way) – Integration of TBM in CLEX. Supporting system • CLIATCIN0005 (under way) - Integration of TBM in CLEX. RF components • EDMS 1366389 – TBM installation in CLEX. Detailed planning (preliminary)