An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC TBM Prototype T0@CLEX Integration. Inventory. Planning Report - March 2014 Dmitry Gudkov

  2. CONTENTS • 2D layout • Inputs • Supporting elements for CLEX components in the working area • Integration • Inventory • Integration of TBM and modification of CLEX components. Drive beam • Integration of TBM and modification of CLEX components. Probe beam • Inventory of the CLEX components (working area, preliminary) • Status of components production for TBM • Planning for the TBM installation in CLEX • Documentation

  3. TBM Prototype T0@CLEX. 2D Layout. Phase 1 2D layout is based on one presented by Igor on 3.04.2013 LINK • 1 PETS and 1 SAS will be powered; • VGVs are installed on each extremity to detach the test stand; • Engineering design and integration of primary RF network is required. Module border Module border

  4. INPUTS. Integration of TBM. Probe beam 3D model is based on the document prepared by Wilfrid Farabolini: EDMS 1366387 Are implemented in the drawing CLIATCIN0005 (under way):

  5. INPUTS. Integration of TBM. Drive beam Positions of the quadrupoles, input from Jacob Esberg: EDMS 1366388 Are implemented in the drawing CLIATCIN0005 (under way):

  6. TBM implantation in CLEX storage

  7. TBM implantation in CLEX

  8. TBM implantation in CLEX

  9. TBM implantation in CLEX

  10. TBM implantation in CLEX ~14 meters

  11. TBM implantation in CLEX

  12. TBM implantation in CLEX

  13. TBM supporting benches (24 holes to be drilled for installation) 2 Feet to be reused in different place (8 holes to be drilled) New girders (x3) Supporting Elements for TBM and CLEX Components • All green feet will not be moved • Green girders will be moved by several cm.

  14. TBM implantation in CLEX

  15. Installation of the TBM supporting system

  16. Installation of the components of the TBM + alignment control

  17. TBM implantation in CLEX

  18. TBM implantation in CLEX

  19. CLEX working area after installation of components

  20. Final tests and cables reconnection

  21. Status of components. TBM

  22. Status of components. TBM. Primary RF Network

  23. Status of components. CLEX working area Cooling pipe

  24. Resources Cooling system: final integration is under way by Vadim Soldatov and Alexios Lorens Vamvakas Installation: FSU108, Andrey Olyunin, Wilfrid Farabolini (CLEX equipment coordination) Vacuum for CLEX: Esa Antero Paju Fiducialization, alignment: ABP-SU Special tasks: external companies or other groups of CERN are involved

  25. Documentation • EDMS 1366387 – INPUT. Integration of TBM in CLEX. Probe beam • EDMS 1366388 – INPUT. Integration of TBM in CLEX. Drive beam • CLIATCIN0004 (under way) – Integration of TBM in CLEX. Supporting system • CLIATCIN0005 (under way) - Integration of TBM in CLEX. RF components • EDMS 1366389 – TBM installation in CLEX. Detailed planning (preliminary)