This document outlines the scheduled maintenance and support activities for the accelerator systems, including the PASS for 56MHz installations, injector testing, and specific jobs for the Booster and AGS from 0700 to 1100 hrs. It details access times to the RHIC and outlines morning and afternoon maintenance activities, including tunnel sweeps and RF schedules. Additionally, there will be discussions regarding experimental sweeps during the hysteresis ramp setup at 1430 hrs. Please adhere to LOTO application protocols starting at 4 AM.

luz
Download Presentation

Accelerator Support and Maintenance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Accelerator Supportand Maintenance Run 14

  2. Maintenance Tomorrow • PASS for 56MHz, install and test, CeC, eLens. • Injectors: • Booster and AGS 0700-1100hrs CA Specific Jobs only. • RHIC 0700-1400hrs Morning RA in most of ring CA in the afternoon. • Sweep 4 o’clock RF at 1600hrs

  3. Schedule • Booster and AGS LOTO application starting at 4am. • Access to RHIC promptly at 0700, all but kicker and RF areas. • RHIC sweeps early afternoon in tunnel. • Final tunnel sweep at 4Z1. • Experimental Sweeps during hysteresis ramp and setup.

  4. Details, plans and discussion here at 1430hrs