slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes PowerPoint Presentation
Download Presentation
Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes

Loading in 2 Seconds...

play fullscreen
1 / 40

Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes - PowerPoint PPT Presentation


  • 159 Views
  • Uploaded on

Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes. Origo PhaseID System. No cell phones No work delays due to lack of cellular coverage Use on any voltage Very portable (only 3 lbs) Lowest cost solution available.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
    Presentation Transcript
    1. Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes

    2. Origo PhaseID System • No cell phones • No work delays due to lack of cellular coverage • Use on any voltage • Very portable (only 3 lbs) • Lowest cost solution available

    3. A GPS timing signal is used to simultaneously measure phase at a reference location and at a field location. The phase attribute at the reference location is known. By comparing the reference and field phase measurements, the field phase attribute can be determined. Principal of Operation

    4. Synchronous Motor Connected to Phase A

    5. Synchronous Motors Connected to Phases A, B and C

    6. Snapshot of Synchronous Motors at Same Instant of Time

    7. Phase Measurement Comparisons • The reference phase base station can be connected to any convenient wall socket of any phase. • Each GPS second, the wall socket phase is measured and stored in a PC file. • When touched to any energized line, the field probe measures the unknown phase at the next GPS second and encodes it into a 9-digit sequence. • Base and field measurements can be compared at any convenient time and manner by simply entering the 9-digit sequence into the PC.

    8. Available in Handheld or Lineman

    9. Handheld on Transmission Lines • 345KV • No extendo stick required. • Determine all 3 phases with a single measurement.

    10. Handheld on Overhead Lines 69KV 12.5KV

    11. Handheld in Cabinets 12.5KV Bushing 12.5KV test Point

    12. Handheld in Substations 69KV Buss 12.5KV Buss

    13. Handheld on Single Phase Line

    14. Handheld with Netbook PC & Aircard

    15. Convert a 20 Minute Extendo Stick Phasing Task on High Overhead Lines into a 20 Second Task using the Handheld 69KV

    16. Lineman Field Probe Substation Buss 12.5KV Bushing

    17. Lineman Field Probe Elbow Test Point Secondary Conductor

    18. Lineman Secondary Adapter (Optional)

    19. Non-Real-Time phase attribute determination. Write down the phase sequences and enter them into the base station later. Call your dispatcher, or any other utility personnel, and give them the 9-digit sequence. They will enter it into their PC and tell you the phase attribute. Real-Time phase attribute determination if Internet access available. Automatically records the phase sequence in a measurement file. Provides GPS location. Accepts user notes. Real-Time Satellite communication link available soon. Available in Manual or Datalogger Manual Version Datalogger Version

    20. Base Station Software

    21. Tagging Reference Phase • Tagging reference phase is one of the most important concepts of phase identification. • Tagging reference phase simply refers to what phase attribute you wish to call each 3-phase conductor. • There is no universal “Phase A”. Phases A, B, and C are simply the phase attributes the utility wishes to tag or assign to each of the 3-phase conductors. • Once assigned, all conductors of the same phase are tagged according to this chosen tagging reference phase.

    22. Open and Save Configuration Files

    23. Typical Configuration Files

    24. Configuration Setup

    25. Entering Phase Sequences

    26. Secondary Phase Attribute

    27. Primary and Secondary Connection Phase Attributes

    28. Field PC Software

    29. User Inputs

    30. GPS Position

    31. Batch Convert • All measurement sequences can be converted to phase attribute with a single click. • First, copy the base station daily reference file into the field PC data directory. • Next, click on the third icon to the right of the measurement sequence window (red-to-green icon). • This action converts all measurement sequences to phase attributes and changes all red dots to green dots.

    32. Three Phase Vertical Lines

    33. Three Phase Horizontal Lines

    34. Remote Base Stations

    35. Lineman Field Probe Soft Case

    36. Lineman Field Probe Hard Case

    37. Base Station

    38. Base Station Antenna

    39. PhaseID USA Customers (That we know of) Origo also has customers in Australia, Canada, India, Jamaica, New Zealand, and Taiwan.

    40. Bottom Line When you are tasked with collecting thousands of attributes to phase identify your entire utility, no other system available is as fast and convenient as the Origo PhaseID System