Update on Flowgate Stability Limit Study

Update on Flowgate Stability Limit Study. Entergy Transmission AFC Stakeholder Meeting Houston, TX September 19, 2006. Problem Definition.

lore
Download Presentation

Update on Flowgate Stability Limit Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Flowgate Stability Limit Study Entergy Transmission AFC Stakeholder Meeting Houston, TX September 19, 2006

  2. Problem Definition • The stability limit on the Mt. Olive – Hartburg line defines the maximum MW flow level that can be accommodated on the Mt. Olive – Hartburg line upon the contingency of the Webre – Wells line

  3. Study Purpose • To review the existing flowgate limit on the Mt. Olive – Hartburg 500 kV line • Perform sensitivity studies to determine if the MW rating of the line could be increased • Evaluate solutions/options to improve the flow gate limit

  4. Study Assumptions • Peak case • 2006 summer peak case • Load power factor in WOTAB is 0.945 • IPP units in WOTAB are turned on based on the status of firm transmission service • Nelson unit 6 or Sabine unit 4 is out of service in the base case • WSCC Criteria applied for voltage dip

  5. Improve post-fault voltage Minimize motor tripping Voltage Dip Criteria

  6. Study Results

  7. Sensitivity Study • Peak Case • With Nelson Unit 6 on-line at minimum generation (MW) • With Sabine unit 4 on-line at minimum generation (MW) • Off-Peak case • 2005 Winter Case • Load power factor in WOTAB is 0.95 • Entergy and IPP units in WOTAB area are dispatched based on historical information • Post Contingency Flow on Mt. Olive – Hartburg line is 1250 MW

  8. Sensitivity Study Results • Dispatch of Nelson Unit 6 or Sabine Unit 4 has negligible impact on the Mt. Olive – Hartburg 500kV stability limit • Variation in load levels in WOTAB area has very little impact on the Mt. Olive – Hartburg 500kV stability limit

  9. Solution Options • SVC Option • Peak case • 300MVAR SVC at Hartburg 500 & 230kV stations • Series Compensation Option • Peak case • 50% Series Compensation on Mt. Olive – Hartburg 500kV Line Results of Options Evaluated: • 300MVAR SVC at Hartburg 500 kV and 230kV stations do not yield an improvement in the stability limit • Series compensation has the potential to improve the stability limit

  10. Dynamic Simulation Plot

  11. Study Summary • Sensitive studies indicate that stability limit on Mt. Olive - Hartburg 500kV line is not affected by generation dispatch and load changes in WOTAB area • Series compensation can improve stability limit on Mt. Olive - Hartburg 500kV line • Entergy will further evaluate this option in their planning process • The flowgate limit will continue to be set to 1050 MW