Challenges and Considerations for Lower Snake River Compensation Plan Program 2022 Annual Meeting in Boise

Planning and implementing changes at the Lower Snake River Compensation Plan Program require careful consideration of permitting, consultation, compliance with regulations, and project implementation challenges. The program focuses on fish production changes and project implementations, such as converting parr to smolts, shifting release locations, ensuring ESA compliance, and addressing infrastructure issues. Each change presents unique obstacles, highlighting the importance of strategic planning and coordination to navigate the evolving landscape effectively.

llistosella
Download Presentation

Challenges and Considerations for Lower Snake River Compensation Plan Program 2022 Annual Meeting in Boise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHANGE IS HAPPENING AT MY HATCHERY OR TO MY PROGRAM Permitting, Planning and Implementation Considerations A Lower Snake River Compensation Plan Program 2022 Annual Meeting B Boise, May 17-18, 2022 Mark Robertson mark_robertson@fws.gov U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  2. Recap -- Checking the Boxes • US –v- OR – 2018-2027 Management Agreement – Tribal Consultation – Change has the potential to impact many others • ESA – NMFS and FWS • Permitting – Federal, State and Local Permits ESA US-v-OR U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  3. Recap -- Checking the Boxes (Less Important for Maintenance Projects) Develop BA Informs BO Project Description Informs S10 & 4(d) HGMP PAC US-v-OR Proposal All of This + Process/Permits = Change (Embrace it [it’s okay to be grumpy]; don’t fight it) U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  4. Examples – Production Changes • Conversion of Parr to Smolts in Clearwater – NPT/BPA Funded Program – Discontinue parr releases in Meadow Cr. – 400K Parr to 200K Smolts at NPTH to be released in Lolo Creek • Move Lolo Creek Release to Lapwai Creek – LSRCP Funded Program – Increase program from 180K to 200K U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  5. Examples – Production Changes • Cascading Changes – Co-manager discussions • US-v-OR – NPT/BPA in, LSRCP out • ESA – Section 7 for NMFS/FWS • HGMP and AOP linkages • NPT took lead U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  6. Examples – ESA Compliance • EF Naturals (Steelhead) – LSRCP Funded Program – Approaching Take Limits • Make changes to BO entering release year ’23 – LSRCP initiating coordination with FWS – IDFG initiating coordination with NMFS – Coordinated Effort to Stay Ahead of the Game U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  7. Examples – Project Implementation • Marmes Generator Building – Last in a series of unfortunate events (electrical fire and pipeline leak) at Lyons Ferry Hatchery – Fairly straightforward??? • Within existing facility boundary (maybe?) on previously disturbed ground • No ESA issues, no production issues, no permitting issues (maybe?) • No engineering/design/contracting issues (maybe?) • Still need to do paperwork (internal) U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  8. Examples – Project Implementation • Marmes Generator Building – HOWEVER……….. • Realty issue with the COE; Process/Paperwork to reconcile Marmes site boundary issues • Delays could affect contracting – Lead time for ordering pieces/parts – Cost escalation – Unforeseen issues = scrambling • FWS/COE coord. at higher levels U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  9. Examples – Project Implementation • Dayton Satellite Facility Weir – Weir/Dam in an active state of failure – Emergency actions last year – Lots of paperwork needs • Engineering/Design/Contracting • ESA BOs for NMFS and FWS • COE 404 permit/JARPA • Section 106 cultural clearance • WA – Dept. Ecol. SEPA, WDFW HPA, City/County permits U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  10. Examples – Project Implementation • Dayton Satellite Facility Weir – Using consultants to tackle most of the work – Lots of paperwork = lots of time • Early coordination • Reviews • Procedural timeframes outside of our control • Supply chain concerns • Did I say “active state of failure” U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  11. Examples – Project Implementation • McCall Hatchery Adult Holding Pond – Water temperature issues at SF Salmon Satellite Facility – Climate Change? – Rapid River Hatchery no longer an option – Build new adult holding ponds • SF Salmon Program – LSRCP • JCAPE – NPT/BPA U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  12. Examples – Project Implementation • McCall Hatchery Adult Holding Pond – Fairly straightforward • Within existing facility on previously disturbed ground • No ESA issues, no production issues, no permitting issues • No engineering/design/ contracting issues • Still need to do paperwork (internal) • Cost constraints – “new” infrastructure U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  13. Summary • Each “Change” has its own challenges – Re-use/re-purpose as appropriate • Timing is Everything – Plan wisely – Be ready for some surprises – Always have contingencies • Communication/coordination at all levels • Don’t Fight the System – Focus on efficient use of existing tools U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”

  14. Questions??? Input??? Experiences to Share??? U.S. Fish and Wildlife Service Lower Snake River Compensation Plan Office “Fish for the Future”