Infra ICD Leads

Infra ICD Leads. INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF?. INFRA:Dish. By T0 Description of current INFRA IF Identified (bullet list of requirements) using template By T0=12W (RR)

lipson
Download Presentation

Infra ICD Leads

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Infra ICD Leads • INFRA:DISH = DISH • INFRA: LFAA = LFAA • INFRA:SDP = SDP • INFRA:CSP = CSP • INFRA:SADT = SADT • INFRA:MGR = MGR • INFRA:AIV = No IF?

  2. INFRA:Dish • By T0 Description of current INFRA IF Identified (bullet list of requirements) using template • By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config

  3. ICD INFRA and DSH... • Issues • Final Array Layouts • Loadings and Mechanical Interface • Responsibility for Bolt cage assembly (DISH?) • Power per antenna • Fibre / sleeve IF to DISH (INFRA or SaDT) • UPS for stowing (Dish or INFRA?) • Separate enclosure for Survey (RFI shielded) • Assume 10% of array can fail?

  4. INFRA:MGR • Issue • No major IF issues • Control room location?

  5. INFRA:MGR • By T0 Description of current INFRA IF Identified (bullet list of requirements) using template • By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config

  6. INFRA:SDP • Issues • Scale of SDP (Qty racks, power) • RSA : Location study • Power trade off (efficiency) • Power Quality, Redundancy • SDP technology selection timeline

  7. INFRA:SDP • By T0 RSA Location study done IF Identified (bullet list of requirements) using template • By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config

  8. ICD INFRA and SaDT..... Issues • Location of Super computer centre (RSA) • Use of existing Fibre links -AIV • Special requirements for Masers? • INFRA.COMMS data over network

  9. INFRA: SADT • By T0 IF Identified (bullet list of requirements) using template • Location of RSA SDP study By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config

  10. ICD INFRA and CSP • Issues • 250 racks for Pulsar search (RSA) • Rack requirements for LFAA/Survey (AUS) • CSP Distances (Survey)

  11. INFRA:CSP • By T0 Description of current INFRA IF Identified (bullet list of requirements) using template By T0=12W (RR) • IF Driver Requirements Defined • By PDR Signed off ICD under Config

  12. ICD INFRA and LFAA.... • Issues: • Power system design (Solar?) • Beamformer Bunker

  13. System Level issues • Array configuration • Firm requirements • Con Ops • RFI ITT • Construction supervision • Support Concept • Close loop on Costs • Scope of Hosting agreements

More Related