Impact/Compensation Assessment Method (ICAT) Application for Utility Corridors - PowerPoint PPT Presentation


  • 271 Views
  • Uploaded on

Impact/Compensation Assessment Method (ICAT) Application for Utility Corridors. What is ICAT. Modification of the Charleston Method. Factor definitions revised to reflect South Louisiana conditions and reflect the watershed approach to compensation brought about by RGL 02-2.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Impact/Compensation Assessment Method (ICAT) Application for Utility Corridors' - liam


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
what is icat
What is ICAT

Modification of the Charleston Method.

  • Factor definitions revised to reflect South Louisiana conditions and reflect the watershed approach to compensation brought about by RGL 02-2.
  • Some Charleston factors removed and others split.
  • Overall weightings remain the same.
  • Weighting of factors changed depending upon perceived importance by the ICAT work group.
  • Calculations unaltered (except for cumulative effect)
why are we developing a new assessment method
Why Are We Developing A New Assessment Method
  • Other methods produce inconsistent and unpredictable results among users
  • Data collection requiring some degree of expertise
benefits expected from icat
Benefits Expected From ICAT
  • Has repeatable results among interdisciplinary project managers having variable regulatory experience
  • Provides a quick and easy assessment methodology
  • Requires minimal amount of field data collection
  • Uses a single set of worksheets applicable to all habitats.
project specifics
Project Specifics
  • Impacting high quality, relatively undisturbed forested ecosystem.
  • 30 acres in permanently cleared right-of-way.
  • 15 acres in temporary work areas to be restored upon completion of the work.
  • Compensation to be provided offsite, within the basin of impact at either a bank or site specific.
compensation to occur at existing bank within the basin of impact
Compensation to Occur at Existing Bank Within the Basin of Impact

Mitigation Areas Suitable for Permit No.

__________________ _________________________________________________________

Bank Name LONESOME DOVEHabitatsMgt. P.Acreage Acreage

AvailableNeeded

Sponsor Parish Name EVANGELINE BLH - 0.68 0.00

LONESOME DOVE, L.L.C. RESTO

SW - 0.68 0.00

GEORGE MANUEL RESTO

187 ROBERT AVE.

VILLE PLATTE, LA 70586

(Work) (337) 363-5528

(Fax) (337) 363-5529

E-mail ) kmanuel@cebridge.net

Hydrologic Unit 08080201 - MERMENTAU HEADWATERS

Physiographic Region WESTERN TERRACES

site specific mitigation project
Site Specific Mitigation Project
  • 100-acre site currently in sugar cane. The agricultural area no longer exhibits wetland vegetation and hydric conditions but soils are hydric by definition on all but 5 acres.
  • Propose to effectively restore hydric conditions to hydric soils and plant the site with hardwood species common to the area.
  • Perpetual conservation easement to be held by a recognized private land trust.