THE GREAT MAN-MADE RIVER PROJECT. THE GREAT MAN-MADE RIVER PROJECT. WATER RESOURCES IN LIBYA. Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700 mm (67 in) in the north to 6000 mm (236 in) in the south.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'THE GREAT MAN-MADE RIVER PROJECT' - liam


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide3

THE GREAT MAN-MADE RIVER PROJECT

WATER RESOURCES IN LIBYA

Only 5% of the entire area of Libya exceeds 100 mm (4 in) annually. Evaporation rates are also high ranging from 1700 mm (67 in) in the north to 6000 mm (236 in) in the south

GROUND WATER 95.6%

SURFACE WATER 2.3%

DESALINATION 1.4%

WATER TREATMENT 0.7%

slide4

THE GREAT MAN-MADE RIVER PROJECT

Jefara

Green Mountains

Hamada

Sirt

Murzug

Kufra

Mediterranean Sea

Tripoli

Benghazi

Sirt

Ajdabiya

In a recent study conducted under the supervision of the UN Centre for Environment & Development in the Arab Region & Europe CEDARE, the Nubian Basin (of which Kufra is part) was estimated at containing 373.3 x 10^12 m3.

If the neighboring countries extract water at a rate of 1380 MCMY it is calculated that the reserve would last 4860 years.

Over extraction in these basins has resulted in seawater intrusion in the coastal aquifers with TDS levels reaching 7000ppm in the Tripoli region

These basins contain

10,000 – 12,000 cubic Km.

of economically extractable water

slide5

THE GREAT MAN-MADE RIVER PROJECT

9.00 m3

1.05 m3

0.79 m3

Desalination

Transportation by ships

Great Man-Made River Project

0.74 m3

Pipeline from South Europe to Tripoli

Cost Comparison Between Different Water Supply Alternatives

Quantity of water per One Libyan Dinar

slide6

THE GREAT MAN-MADE RIVER PROJECT

03 October 1983

The General People's Congress held an extraordinary session to draft the resolutions of the basic people's Congresses, which decided to fund and execute the Great Man-Made River Project.

28 August 1984

The leader of the Revolution lays the foundation stone in Sarir area for the commencement of the construction of the Great Man-Made River Project.

slide7

THE GREAT MAN-MADE RIVER PROJECT

Brega PCCP Plant

NE Jebel Hasouna

Wellfield

Sarir

Wellfield

Sarir PCCP

Plant

E Jebel Hasouna

Wellfield

Tazerbo

Wellfield

Conveyance

- Length 190 Km (119 Miles).

- Diameter 4.0 m (13 ft.).

Gedammes Wellfield

No. of Wells 144

Total Production 90 MCMY

Jaghboub Wellfield

No. of Wells 40

Total Production 50 MCMY

Mediterranean Sea

Tripoli

Tobruk

Benghazi

Sirt

Ajdabiya

Ghadames

Jaghboub

Sarir & Tazerbo Well Fields

- Total Production 2.0 MCMD

- No. of Wells 234

- Length 1926 Km (1204 Miles ).

of mainly 4.0 m (13 ft.) diameter pipes

East & NEJebel Hasouna Wellfields

- No. of Wells 586

- Total Production 2.5 MCMD

- Length of 1.732 Km (1,083 Miles)

of mainly 4.0 m (13 ft.) diameter pipes

Kufra Wellfield

No. of Wells 285

Total Production 1.68 MCMD

Tazerbo

Kufra

slide8

THE GREAT MAN-MADE RIVER PROJECT

  • Reservoirs
    • Ajdabiya Holding Reservoir - Capacity 4.0 mcm
    • Al Gardabiya Reservoir - Capacity 6.8 mcm
    • Omar Mukhtar Reservoir - Capacity 4.7 mcm
    • The Grand Al Gardabiya Reservoir - Capacity 15.4 mcm
    • The Grand Omar Mukhtar Reservoir - Capacity 24.0 mcm

Total Storage Capacity = 54.9 mcm

slide9

Two Pipe Manufacturing Plants

    • Sarir Plant
  • Three lines producing 120 pipes daily
    • Brega Plant
  • Two lines producing 80 pipes daily
cut away section of a pre stressed concrete cylinder pipe pccp

THE GREAT MAN-MADE RIVER PROJECT

Cut-away Section of a Pre-stressedConcrete Cylinder Pipe (PCCP)

PIPE MAKE-UP

MORTAR COATING

STEEL PRE-STRESSING WIRE

OUTER CONCRETE CORE

STEEL LINER

INNER CONCRETE

CORE

Length of Pipe = 7.52 meters

Pipe Diameters 1.6-4.0 meters

Weight of Pipe = 75-83 tonnes

Pressure Rates 6-26 bar

17-18 km of prestressed Wire

12-16 tonnes of Cement

slide12

Haul Roads

    • Phase I Total Length 1,600 Km (1,000 Miles).
    • Phase II Total Length 2,155 km (1,340 Miles).
slide13

Pipe Laying

    • Depth of Trench 7.0 m (23 ft.).
    • Capacity of Cranes Used up to 450 tons
slide14

THE GREAT MAN-MADE RIVER PROJECT

Water Allocation in M3/Day

6.57 Million Cubic Metres Water per Day Transfer

2,398 Million Cubic Metres per Year

All Phases in M3/Day

1,838,480 M3 Municipal --> (28 %)

4,596,200 M3 Agricultural --> (70 %)

131,320 M3 Industrial --> (2 %)

slide15

THE GREAT MAN-MADE RIVER PROJECT

Mediterranean Sea

Tripoli

Tunisia

Tobruk

Benghazi

Sirt

Ajdabiya

Brega PCCP Plant

Ghadames

Jaghboub

Egypt

NE Jebel Hasouna

Wellfield

Sarir PCCP

Plant

Agricultural Land Developed 130,000 hectare approx. ( 20,000 farms )

About 100,000 existing farms will be supplemented with irrigation water from the project which will have great impact on their productivity and encourage the settlement of farmers and their families, hence a positive impact on the value of their property

Algeria

Sarir

Wellfield

E Jebel Hasouna

Wellfield

  • The agricultural development projects are being carried out in three regions in Libya:
  • Benghazi Plains Region – net irrigated area 30,000 hectares 14,000 hectares to be developed as large farm projects.
  • Jefara Plains Region (Tripoli) - net irrigated area 80,000 hectares 1,500 hectares to be developed as large farm projects.
  • Al-Ghardabiya Plains Region (Sirt) - net irrigated area 20,000 hectares 5,400 hectares to be developed as large farm projects.

Tazerbo

  • The agricultural development plan aims to:
  • Realize the highest possible rate of self-sufficiency in grain and fodder crops.
  • Increase the capital investment and job opportunities in the agricultural sector.
  • Produce raw materials for the food processing industry.
  • Encourage and support agricultural settlement.

Tazerbo

Wellfield

American Companies have already invested in the development of Large Farm Projects:

- 1300 Hectares – Benghazi Plains Region

(this will be increased to 14,000 Hectares in the future)

- 800 Hectares – Tarhouna

- Valmont Valley supplying Irrigation equipment

- Case supplying agricultural equipment

  • Investors with experience in the field are invited to participate in:
      • Implementation
      • Operation
      • Maintenance
      • Management and product marketing
  • Of the large farm projects

Kufra

Sudan

0

150

300

450

600

Km

slide16

THE GREAT MAN-MADE RIVER PROJECT

We can conclude that, adequate fresh water supplied by the gigantic GMRA project, have become an integral part of the infrastructure (including real estate) in all domestic, agricultural and industrial aspects, both in rural and urban areas, so as these areas grow, the need for infrastructure increase.

slide17

THE GREAT MAN-MADE RIVER PROJECT

Which results in:

Encouraging people in rural areas to stay in their land, due to Agricultural expansion.

slide18

THE GREAT MAN-MADE RIVER PROJECT

In urban areas, the real estate prices will escalate due to the improvement of the life standards.

slide19

THE GREAT MAN-MADE RIVER PROJECT

Mediterranean Sea

Tripoli

Tobruk

Tunisia

Benghazi

Sirt

Ajdabiya

Phase I - $5.53

s

Ghadames

Jaghboub

Billion

Egypt

NE Jebel Hasouna

Wellfield

Phase II - $8.05

s

Algeria

Sarir

Wellfield

Billion

E Jebel Hasouna

Wellfield

Tazerbo

Future Phase - $6.0

s

Tazerbo

Wellfield

Billion

Kufra

Sudan

0

150

300

450

600

Km

19.58 Billion Dollars Project Cost

Capital Cost $19.58 Billion

Operation & Maintenance Cost $14.11 Billion

Total Investment Cost (50 Years) $33.69 Billion

Expected Production Quantity 120 Billion m3

Unit rate/ m3 water to recover investment cost over 50 years

$0.28/m3

slide20

THE GREAT MAN-MADE RIVER PROJECT

Sources for Project Financing

The project is financed from the following sources:-

- Law (10/83) revenues.

- The revenue gained by selling water produced by the project’s System.

- What is annually allocated in the country’s development budget, loans and financial facilities.

slide21

THE GREAT MAN-MADE RIVER PROJECT

Fees (indirect taxes) , established by Law no (10)/1983

  • Fees on documentary credits and money orders.
  • Fess on selling fuel derivations.
  • Fees on commerce , trade and industrial licenses.
  • Fees on selling local and imported Tobacco and Cigarettes.
  • Fees on international travel tickets.
slide22

THE GREAT MAN-MADE RIVER PROJECT

PROJECT STATISTICS

Total No. of Pipes

585,296

Volume of Trench Excavation

240 Million M3

Total Weight of Cement

6.9 Million Tonnes

The length of pre-stressing wire used in the project is equivalent to 220 times the circumference of the earth .

The total number of wells is 1,350

The amount of aggregate used in the project is sufficient to build 16 pyramids the size of the Great Pyramid.

The cement used in the project is sufficient to construct a concrete road from Tripoli to Bangkok

slide23

THE GREAT MAN-MADE RIVER PROJECT

Mediterranean Sea

Tripoli

Tobruk

Benghazi

Sirt

Ajadibya

Germany

England

Tazirbu

France

Al Kufrah

Project Scale

0

150

300

450

600

Km

slide24

THE GREAT MAN-MADE RIVER PROJECT

KANSAS

MISSOURI

COLORADO

OKLAHOMA

ARKANSAS

NEW MEXICO

TEXAS

LOUISIANA

Tripoli

Tobruk

Benghazi

Ajadibya

Sirt

Ghadames

Tazirbu

Al Kufrah

Project Scale

0

150

300

450

600

Km

slide25

THE GREAT MAN-MADE RIVER PROJECT

Thank You for your attention and have a nice day!