Hydrology Working Group program Mission 2: Model preparation and setup

Hydrology Working Group program Mission 2: Model preparation and setup. Wil N.M. van der Krogt 12 – 13 November 2014 Denizli. The River Basin Explorer project. The Netherlands. Hydrology Workgroup. RIBASIM. River Basin Explorer. WFD explorer. Export. Import. Cases. Water balance.

lestrada
Download Presentation

Hydrology Working Group program Mission 2: Model preparation and setup

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hydrology Working Group programMission 2: Model preparation and setup Wil N.M. van der Krogt12 – 13 November 2014 Denizli • The River BasinExplorer project • The Netherlands

  2. Hydrology Workgroup RIBASIM • RiverBasinExplorer WFDexplorer Export Import Cases Water balance Concentrations, EQR, Scores Schemeofprocessesandworkflows in theRiver Basin Explorer Link between RIBASIM and WFD Explorer

  3. Supply • Quantity (scarcity, upstream developments) • Quality Degradation (morphology) • Cost of Options • Demand • Population growth • Increased irrigation • Increased hydro-power • Environmental awareness Buyuk Menderes RIBASIM: tool for balancing water supply and demand Why balance: the Water Balancing Act Measures Measures IWRM

  4. Water supply Groundwater Surface water Aquifers Sub-catchments Ayeryawaddy River basin (Myanmar)

  5. Water demand

  6. Infrastructure

  7. Introduction R I B A S I M Oum Er Rbia river basin (Morocco)

  8. Introduction R I B A S I M Entry of node and link characteristics using spreadsheet based model data input forms

  9. 1950 2013 DMI demand demand year 2013 2030 2050 Introduction R I B A S I M

  10. Hydrology Work Group • What has been done: • September: • Kick-off of the project, opening ceremony • Short introduction on river basin simulation model RIBASIM • Start of data collection based on general data shopping list • October: • Collection of data based on general data shopping list like maps • Start setup of the model

  11. Hydrology Work Group • Objective of mission • The preparation of the following deliverables: • RIBASIM node-link network schematization for Buyuk Menderes River basin (version 1) • Entered network schematization in RIBASIM • Detailed list of required data: model data, time series data and other data • Overview of the already available data • List of identified missing data and who will collect them

  12. Hydrology Work Group

  13. Hydrology Work Group Questions ? Buyuk Menderes RIBASIM

  14. Measure and strategy data files Measure and strategy data files Measure and strategy data Land-use and population data 2010 - 2050 Land-use and population data 2010 - 2050 Agriculture sector data Land-use and population data 2010 - 2050 Land-use and population data 2010 - 2050 Agriculture sector data Crop plan data Land-use and population data 2015 - 2050 Waste load data Agriculture sector scenarios Water quality scenarios Socio- economic scenarios Historical hydrological data 1950 - 2013 Result files RIBASIM7 / Delwaq Water demand, -allocation and quality Result files Results Model data base for base year 2013 Climate change data files Climate change data files Change of hydrological data Interventions, management actions Climate change scenarios