An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. March 10,2010 Preproposal Presentation Testing & Inspection Services - REF

  2. Agenda Introduction Related Projects Project Schedule Site and Building Construction Documents Proposal

  3. QA/QC Philosophy • Section 01456 • Contractor—Quality Control Program • Testing • Inspection • Owner—Quality Assurance Program • Testing 24 hours • Inspection 48 hours • Contractor is still responsible

  4. Contract 28: Renewable Energy FacilityWhat’s it all about? • Contract 28 builds a 50,600 square foot multi-story building at the Southerly Wastewater Treatment Center to house the following new systems: • Biosolids dewatering and conveyance • Fluidized bed incineration • Steam production using waste heat from incineration • Electricity production using steam • This will allow Southerly to abandon its existing thermal conditioning, dewatering and conveyance, and multiple hearth incineration systems.

  5. Contract 28: Renewable Energy Facility Incineration Truck Loading Dewatering Turbine Generator Bldg.

  6. NORTH NORTH SOUTHERLY WASTEWATER TREATMENT CENTER MAINT. BLDG. CONSTRUCTION STAGING AREA 3 ABANDONED IMHOFF TAKS SOLIDS HANDLING & INCINERATION DIGESTER “A” TANK GROUP SITE OF RENEWABLE ENERGY FACILITY SLUDGE STORAGE TANKS TCSTs ROAB “B” DELIVERIES THRU ROAD “B” GATE CONSTRUCTION STAGING AREA 2

  7. Scope of Work TCIS-28 (Full Time) • Project Resident Chief Inspector – fulltime; supported by coordinating Special Inspector (PE) (As Needed Basis) • Specialty Testing Services – Section 01416 • Construction Inspection Services – all disciplines • Shop Witness Testing/Inspection • Laboratory Testing Services – Section 01451

  8. Related ProjectContract 28B: Fluidized Bed Incinerator Equipment Procurement Infilco Degremont is supplying equipment for three fluidized bed incinerator trains to be installed under Contract 28 Price: $49,753,000

  9. Contract 28B Integration Issues: • Equipment delivered by IDI will be received by the Contract 28 contractor. • Most of the equipment IDI is supplying will be installed by the Contract 28 contractor. • IDI’s installation responsibilities are limited to: • Construction of fluidized bed incinerator shells and refractory lining of shells’ interiors • Code welding of waste heat boilers • An IDI representative will be on site to provide technical assistance for the installation of IDI-supplied equipment by the Contract 28 contractor. • For IDI-supplied equipment, site visits by manufacturers’ representatives are covered under IDI’s contract. • Contract 28 contractor will assist IDI in start-up and testing of the incinerator trains.

  10. Project Schedule • Start: June, 2010 • 28B Delivery: Oct, 2010-Oct, 2011 • Start Commissioning: Late 2012 • Complete Work: 2013

  11. Site Plan TRUCK LOAD-OUT BIOSOLIDS HANDLING & CONVEYANCE OFFICES TURBINE GENERATOR INCINERATION BIOSWALE (1 OF 3) GRAY WATER CISTERN Building Area = 50,600 SF; Pavement Area = 29,800 SF

  12. Building Level SchematicBasement (El. 590.5) TRUCK LOAD-OUT MECHANICAL SPACES BIOSOLIDS HANDLING & CONVEYANCE (POLYMER SYSTEM) TURBINE GENERATOR INCINERATION

  13. Building Level SchematicGround Floor (El. 605.5) TRUCK LOAD-OUT SUBSTATIONS CONTROL RM. LAB MULTI-PURPOSE RM. BIOSOLIDS HANDLING & CONVEYANCE NOTE: IF CROSSED OUT, THERE IS NO FLOOR AT THE LEVEL DEPICTED TURBINE GENERATOR INCINERATION

  14. Building Level SchematicSecond Floor (El. 615.5 and 620.5) TRUCK LOAD-OUT MCCs OFFICES BIOSOLIDS HANDLING & CONVEYANCE (STORAGE BINS, CAKE PUMPS) EL. 620.5 EL. 620.5 EL. 615.5 TURBINE GENERATOR INCINERATION

  15. Building Level SchematicThird Floor (El. 635.5) TRUCK LOAD-OUT ROOF EL. 630.50 UNASSIGNED COMM. RM. & LOCKER RMS. BIOSOLIDS HANDLING & CONVEYANCE (CENTRIFUGES) TURBINE GENERATOR INCINERATION

  16. Building Level SchematicRoof (El. 650.5) TRUCK LOAD-OUT ROOF EL. 630.50 ROOF EXTENSION TO ACCOMMODATE OVERHEAD CRANE ON THIRD FLOOR) ROOF EXTENSION TO ACCOMMODATE WASTE HEAT BOILERS

  17. General Building Information: • 1,057 14x73 75-ton H-piles under Biosolids Handling & Conveyance, Incineration and Offices • 17 14x73 75-ton H-piles under Truck Loading • 77 14x73 90-ton H-piles under turbine generator • 50 10x42 H-piles under biofilter • Nominal 18” thick basement floor slab; thicker at pile layouts and pile caps • Nominal 16” thick concrete perimeter walls from basement floor slab to El. 601.83 • 31’ x 10’ x 4’ thick isolated concrete pad for turbine generator

  18. General Building Information (Cont.): • Floor grating (excluding platforms) is limited to portion of third floor in Incineration area. Remaining floors are concrete. • One freight elevator; adjacent stairwell extends from basement to roof. • One passenger elevator; adjacent stairwell extends from basement to third floor. • Modified built-up roof system. Metal roof panel system for roof extensions. • Aluminum curtain wall for Office area. • Face brick on masonry block backup for remainder of building.

  19. North Building Exterior

  20. East Building Exterior

  21. South Building Exterior

  22. West Building Exterior

  23. Contract 28 Bid Documents 3 Drawing Volumes Containing a Total of 903 Sheets Volume 1 of 3: Title (T) 6 sheets General (G) 3 sheets Demolition (D) 21 sheets Site Civil (C) 32 sheets Process Mechanical (M) 110 sheets Architectural (A) 81 sheets Volume 2 of 3: Title (T) 6 sheets Structural (S) 109 sheets HVAC (H) 45 sheets Plumbing (P) 35 sheets Fire Protection (F) 7 sheets Instrumentation (I) 121 sheets Volume 3 of 3: Title (T) 6 sheets Electrical (E) 321 sheets

  24. Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 1 of 3: Div. 1 – General Requirements (49 Sections) Div. 2 – Site Construction (15 Sections) Div. 3 – Concrete (7 Sections) Div. 4 – Masonry (5 Sections) Volume 2 of 3: Div. 5 – Metals (14 Sections) Div. 6 – Wood and Plastics (2 Sections) Div. 7 – Thermal and Moisture Prot. (17 Sections) Div. 8 – Doors and Windows (7 Sections) Div. 9 – Finishes (8 Sections) Div. 10 – Specialities (10 Sections) Div. 11 – Equipment (27 Sections) Div. 12 – Furnishings (3 Sections) Div. 13 – Special Construction (23 Sections)

  25. Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 3 of 3: Div. 14 – Conveying Systems (5 Sections) Div. 15 – Mechanical (43 Sections) Div. 16 – Electrical (34 Sections)

  26. Pre-Proposal Communication Information and Data requests • tcis-28@neorsd.org • (March 16th is the last day)

  27. Proposal Content • Executive Summary (5 pages) • Qualifications (20 pages) • Individuals • Project Team • Technical Approach (30 pages) • Local Participation ~ 80% (3 pages) • SBE Participation ~ 15% (2 pages) • Testing Services Rate Schedule • Proposed Overhead Rates: field, office

  28. Evaluation Criteria • Written Qualifications ~ 60% • Written Technical Approach ~ 25% • Presentation & Interview ~ 15% (Optional)

  29. Requirements 15% SBE Goals • Certified List Updated Monthly • Tiffany Jordan, Contract Compliance Manager 80% Local Requirement Presentation by up to Three (3) Top Ranked Firms (Optional) • 90 minutes for presentation including 30 minutes for questions • Selection committee members will not be announced

  30. THANK YOU FOR ATTENDING! Questions?