1 / 14

Appellant: Tom Harb for Harbco/Beeline Center, LLC August 23, 2011

Project ABC PD – Grande Plaza NE Quadrant –Tract 8 – Lot 4 Bee Line Center DP Appeal of a Development Review Committee Decision. Appellant: Tom Harb for Harbco/Beeline Center, LLC August 23, 2011. Appeal – Bee Line Center DP Location Map. Appeal – Bee Line Center DP.

Download Presentation

Appellant: Tom Harb for Harbco/Beeline Center, LLC August 23, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project ABC PD – Grande Plaza NE Quadrant –Tract 8 – Lot 4 Bee Line Center DPAppeal of a Development Review Committee Decision Appellant: Tom Harb for Harbco/Beeline Center, LLC August 23, 2011

  2. Appeal – Bee Line Center DP Location Map

  3. Appeal – Bee Line Center DP WEST VIEW FROM JOHN YOUNG PARKWAY

  4. Appeal – Bee Line Center DP

  5. Appeal – Bee Line Center DP History • 10-05-05 – DP approved by DRC with right-in access only. • 8-23-06 –Change determination request for right-out access. Request was denied by DRC. • 12-03-08 – Change determination request for right-out access. Request was denied by DRC.

  6. Appeal – Bee Line Center DP History (cont.) • 4-23-09 – Appeal of DRC denial to BCC Applicant withdrew request. • 7-13-11 – Change determination request for right-out access. Request was denied by DRC.

  7. Appeal – Bee Line Center DP Cause for Denial • Proximity to Beachline On-Ramp • Inadequate acceleration length • Inadequate distance for weaving • High Traffic Volume (60,000 vpd) • High Speed Roadway (55 MPH Posted) • Consistency with Adjacent Development

  8. Appeal – Bee Line Center DP Speed Study Results (March 2009)

  9. Appeal – Bee Line Center DP Speed Study Results (May 2011)

  10. Appeal – Bee Line Center DP Roadway Geometry

  11. Appeal – Bee Line Center DP Roadway Geometry

  12. Appeal – Bee Line Center DP Current Movements

  13. Appeal – Bee Line Center DP Weaving Movements

  14. Appeal – Bee Line Center DP Action Requested Uphold the denial of DRC for a Right-Out access onto South John Young Parkway

More Related