210 likes | 434 Views
Freight Operator Recognition Scheme John Hix AECOM. London. Employment 2003-2025 Extra 1 million jobs 4.5 to 5.5 Million jobs 20 % Increase. Population Present – 7.7 Million 2031 – 9 Million An extra 1.3 Million – 14% Increase. Vehicles
E N D
Freight Operator Recognition Scheme John Hix AECOM
London • Employment • 2003-2025 Extra 1 million jobs • 4.5 to 5.5 Million jobs • 20 % Increase • Population • Present – 7.7 Million • 2031 – 9 Million • An extra 1.3 Million – 14% Increase • Vehicles • 2001 – 512,000 LGV trips to, from and within London • – 107,000 HGV trips to, from and within London • 2031??
Transport Operators The London Freight Plan Economy Profit Environment Environment – CO2 / Congestion Social & Safety Safety
FORS benefits • Workshops • Toolkits • Benchmarking • London Freight Booster Driver Training • Driving Licence Checking Service • Driver Profiling • FORSight / eNews • Online Driver Training
Case studies • Examples of Savings/Best Practice • Opportunity to Market Company • Let us know!
¨ « What is our definition of freight? Goods Movement Servicing + Utilities Waste
Is sustainable freight even remotely possible? Promotion of Pedestrian and Cyclists Social impacts Development Intensification & Mixed Uses Physical Constraints Economic Factors Transport modes Any Urban Area Control Schemes Major Events Environmental factors Restrictions and Licensing Regulations
Benchmarking • Over 2,500 vehicles currently use the benchmarking system • Benchmarking workshops
Delivery and Servicing Plans (DSP) and Construction Logistics Plans (CLP)
Key elements of Delivery and Servicing Plans (DSPs) and Construction Logistics Plans (CLPs) Delivery & Servicing Plan / Construction Logistics Plan