1 / 5

Standardization of Periscope and Imaging Systems Repairs and Waterfront support

Standardization of Periscope and Imaging Systems Repairs and Waterfront support. 2 – 5 February 2009.

lani
Download Presentation

Standardization of Periscope and Imaging Systems Repairs and Waterfront support

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Standardization of Periscope and Imaging Systems Repairs and Waterfront support 2 – 5 February 2009 Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Critical Technology; February 2009. Other requests for this document shall be referred to the Naval Undersea Warfare Center Division, Newport.

  2. Submarine Imaging Repair Site Certification AUDIT & SURVEILLANCE REQUIREMENTS Planning NAVSEA INST 4855.37 • Plant/Facility • Personnel • Management Gap Analysis ISEA System Certification Self Audit Training Certification Audit / FMAA • Type 8, • Type 15 • Type 18 • Photonics Mast • PMV NAVSEA 04 Letter Surveillances MOA • Meet with • NAVSEA 04 CertifiedRepair Activity NUWC Msg Implementation Regional Repair Centers Lesson Development FMA/EMO POSR PRE-BRIEF TO COMMAND COs Planning Limited Repair Facilities TRAINING REQUIREMENT REVIEW

  3. Requirements Document Review IDENTIFICATION TITLE PAGE CHAPTER 1 SCOPE 1-1 1.1 General 1-1 1.2 Application 1-1 CHAPTER 2 REFERENCES 2-1 3.1 Reference Documents 2-1 3.2 Relevant Documents 2-1 CHAPTER 3 TERMS 3-1 3.1 Acronyms and Definitions 3-1 3.2 National Imaging System Maintenance Organization 3-2 CHAPTER 4 IMAGING SYSTEM MAINTENANCE PROGRAM 4-1 4.1 General Requirements 4-1 4.2 Documentation Requirements 4-2 CHAPTER 5 MANAGEMENT RESPONSIBILITY 5-1 5.1 Management Commitment 5-1 5.2 Customer Focus 5-1 5.3 Quality Policy 5-1 5.4 Planning 5-1 5.5 Responsibility, Authority and Communication 5-2 5.6 Management Review 5-2 CHAPTER 6 RESOURCE MANAGEMENT 6-1 6.1 Provision of Resources 6-1 6.2 Human Resources 6-1 6.3 Infrastructure 6-1 6.4 Workplace Environment 6-2

  4. Requirements Document Review IDENTIFICATION TITLE PAGE CHAPTER 7 PRODUCT REALIZATION 7-1 7.1 Planning of Product Realization 7-1 7.2 Customer Related Processes 7-1 7.3 Design and Development 7-2 7.4 Purchasing 7-2 7.5 Maintenance Evolution 7-4 7.6 Control of Monitoring and Measurement Devices 7-5 CHAPTER 8 MEASUREMENT, ANALYSIS AND IMPROVEMENT 8-1 8.1 General 8-1 8.2 Monitoring and Measurement 8-1 8.3 Control of Non-Conforming Product 8-2 8.4 Analysis of Data 8-3 8.5 Improvement 8-3 APPENDIX A FACILITY REQUIREMENTS A-1 1 Shipping, Receiving and Storage Support A-1 2 General Repair A-3 3 Clean Repair A-3 4 Electronic Unit Repair A-8 5 Machining A-10 6 Cleaning and Refinishing A-11 7 Vertical Test A-12 APPENDIX B BEST PRACTICES B-1 1 Personnel Policies B-1 2 Clean Area Processes B-1

  5. MOA Review PARAGRAPH TITLE PAGE I. SUBJECT: Memorandum of Agreement for National Imaging System Maintenance Program 3 II. REFERENCES: 3 III. PURPOSE: 3 IV. SCOPE: 4 V. AMPLIFICATIONS AND CHANGES: 4 VI. ACRONYMS/DEFINITIONS: 6 VII. WORK DETERMINATION AND INTERFACE DEFINITION: 7 • FUNCTIONS, ASSIGNMENTS, AND RESPONSIBILITIES: 7 • COMSUBFOR and COMSUBPAC N4 (Material Officers) 7 • NAVSEA PMS 435 (Submarine Imaging and Electronic Warfare (I&EW) Systems Program Office) 7 • NUWCDIVNPT Code 3492 (Technical Project Manager) 7 • ISEA for Imaging Systems 8 • National Maintenance Manager 8 • Fleet Maintenance Activities 8 • On-Site Representatives (OSRs) 11 • Regional Repair Center (RRC) 13 • Limited Repair Activity (LRA) 14 • Tenders 16 IX. SCHEDULE: 16 X. ACTIVITY SIGNATURES: 17

More Related