An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANDY StatusFirst commissioning with colliding beams (p+p at s=500 GeV) L.C.Bland, for AnDY 1 February 2011 Time Meeting, BNL

  2. Schematic of detector for Run-11 • Equipment in place: • HCal is two existing 9x12 modules from E864 (NIM406,227) • ECal are two small lead-glass modules from BigCal at JLab • BBC (from PHOBOS) and ZDC • Preshower is newly constructed scintillator arrays • Goals: • Establish impact of 3IR operation on PHENIX/STAR luminosity • Calibrate HCal • relative gain via cosmic-ray m • absolute energy scale via r,L,KS… • Measure hadronic backgrounds to benchmark simulations • Measure jet analyzing power (Lint~10 / pb, P=50%)

  3. Trigger/DAQ electronics Left/right symmetric HCal Left/right symmetric ECal Blue-facing BBC Left/right symmetric preshower Beryllium vacuum pipe IP2 in January, 2011Run-11 Staging of ANDY See http://hena.lbl.gov/IP2/Business/status/<date> for pictures of progress

  4. Commissioning • First data recorded on Weds. 26 January after fixing MVME 2306 and FPGA board (DSM) • Timed-in beam-beam counter, ECal and HCal phototube signals to ADC • Commissioned minimum-bias trigger • Further commissioning on Thurs. 27 January • HV scan of BBC for gain adjustments • Align data pipeline timing for ZDC • Timed-in ZDC, ZDC shower-maximum detector and preshower signals to ADC • Further commissioning on Sun. 30 January • Identify reversed logic issue for time-to-amplitude converters (partially fixed on 31 Jan 15-minute access) • Commission elog, database recording So far, no impact of collisions at IP2 on IP6,8

  5. Event Reconstruction • Reconstruct 200K minimum-bias events as seen in beam-left ECal via • Clustering • Shower-shape analysis • 50 MeV/count for all detectors • Fixed vertex position used (TAC issue) • Epair>12 GeV, |E1-E2|/Epair < 0.8 Neutral pion reconstruction from ECal will be part of HCal calibration Reconstructions concurrent with data acquisition provide critical feedback to experiment

  6. Issuesshould be resolved during 20110202 access • Recover event hit-timing information from BBC detectors • Single-channel issues • Increase monitoring feedback to MCR • … and a long list of small tasks • After access, • adjust gains for ECal and selected HCal (mostly good from cosmic-rays) • start commissioning triggers on HCal, ECal and ZDC We are ~1 week from physics-quality data