OPRG Status Report. 35 Checklist were reviewed and accepted by the review group for the current operating season teleconference by mid-march to review and accept the checklists/procedure for the spring season. OPRG Responsibility.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'OPRG Status Report' - landis


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
oprg status report
OPRG Status Report
  • 35 Checklist were reviewed and accepted by the review group for the current operating season
  • teleconference by mid-march to review and accept the checklists/procedure for the spring season.
oprg responsibility
OPRG Responsibility

OPS is responsible for reviewing and accepting the operating procedures before the start of a new operating season and has delegated this responsibility to OPRG…”

slide3

OPRG Members

  • Brian Tuck, Bonneville Power Administration
  • Jerry Mossing, Alberta Electric System Operator
  • Mike Flores, Tucson Electric Company
  • Tom Isham, Arizona Public Service
  • Robin Manuguid, Sempra Utilities
  • Mark Willis, Sacramento Municipal Utilities District
  • Robert Johnson, Xcel Energy
  • Joe Liberatore, Western Area Power Administration
  • Anitha Neve, WECC Staff Liaison
slide4

OPRG checks for

  • Approved value of OTC limit is specified
  • Specification of stability or thermal limit and time limit requirement to get back within otc is included
  • Coordination with other entities is verified
  • Steps taken to bring operation within the nomogram if needed.