An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning Commission Work Session November 25, 2014

  2. Work Session Objectives • Discuss second set of key code issues and options • Obtain comments and guidance on preferred options or approaches • Review next steps

  3. Bridge Vista Planning Vision Plan Land Use Assumptions and Objectives • Continue to support water-dependent uses; allow for commercial and residential uses that support but don’t compete with the Downtown core. • If development is to occur, promote new uses that are consistent with Astoria’s “working waterfront.” • Encourage design of new or rehabilitated buildings that respect Astoria’s character. • Encourage new development along the River to improve and celebrate the River Trail and provide visual and periodic physical access to the water.

  4. Bridge Vista Planning Vision Plan Land Use Assumptions and Objectives • Improve physical connections to adjacent neighborhoods. • Use setbacks, stepbacks and other measures to ensure an open feel and continued visual access to the river. • Change zoning of area west of 2nd Street from Tourist Commercial to other commercial zone. • Expand (Uniontown) design overlay for the historic district to accentuate the historic area (north of US 30) and create a more prominent gateway for the urban core.

  5. Bridge Vista Land Use Code Issues – Tonight • Permitted uses (on land and over water) • Complementing downtown development • Tourist Commercial zone update

  6. Bridge Vista Current Zoning

  7. Bridge Vista Zoning Framework • Extend existing S-2 zoning east around the West Mooring Basin to areas of existing C-2 zoning • Convert most of the existing Tourist Commercial (C-2) zoning near the bridge to a new pedestrian-oriented zone • Convert western end of existing C-2 zoning around Bridge and C-2 zoning between 1st Street and 2nd Street in BV area to C-3 zoning

  8. Bridge Vista Potential Rezoning

  9. Allowed Uses – Recommended Changes Outside Pedestrian Oriented Zone • Don’t permit fossil fuel and petroleum product terminals in A-2, A-2A, and S-2 zones in this area • Don’t permit manufactured dwellings in S-2 zone • Don’t permit auto sales and gas stations in S-2 zone • Consider limiting warehouses, wood processing in S-2 zone in this area • Allow eating and drinking establishments in C-3 zone with visual connection to water

  10. Allowed Uses – Recommended Uses Within Pedestrian Oriented Zone • Allow most uses permitted in C-3 zone, except: • Don’t permit auto-oriented uses • Don’t permit drive-through facilities • Consider limiting manufacturing uses • Should other uses be prohibited or restricted?

  11. Development Standards • Limit building size to maximum of 25,000 – 35,000 square feet • Other design and development standards to be reviewed at next PC work session

  12. Next Steps • Update code amendments based on Work Session guidance. • Work on next set of draft code amendments: • Design guidelines and standards • Landscaping • Provide draft materials in advance of December work session. • Conduct work session on December 17 • Prepare complete, updated set of code amendments • Conduct work session in January