RPC D etector C ontrol S ystem: towards the final system. Workshop on CMS RPC commissioning and upgrade. Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University. New feature for final system.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' RPC D etector C ontrol S ystem: towards the final system' - lalasa


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

RPC Detector Control System:towards the final system

Workshop on CMS RPC commissioning and upgrade

Pierluigi Paolucci, Anna Cimmino

I.N.F.N. of Naples

Giovanni Polese

Lappeenranta University

Giovanni Polese


New feature for final system
New feature for final system

  • Improved Hardware description from Hardware tree, more detailed features for all components (boards, temperature, MAO, rack and BCs), easier management of all kind of problem happened during the MTCC .

  • Positive performance tests in 904 using the final hardware for one wheel regarding configuring, starting up and db access operations.

  • Additional feature for each wheel, possibility to plot simultaneously the worst six chamber.

  • Additional information about the status of cooling, cavern environmental conditions and magnet status.

Giovanni Polese


Dcs news
DCS news

  • We are migrating the entire structure to the DCS final PCs in P5. All DCS PCs have been put in place, configured and ready for working.

  • From HV/LV point of view, the first step for W+2 test was deeply focused on the hardware setup of the entire system.

  • All chain components has been configured and tested successfully.

  • The HV Mainframe has been installed, configured and now works properly in USC55. This mainframe is temporarily shared with LV to allow testing.

  • The Next step, after creating all the right links and setting the right configuration for HV,LV and T boards, is to upload the setup configuration into Db. Only after this, PVSS is able to retrieve the config from db and start to control the entire system.

Giovanni Polese


Databases
Databases

  • Configuration DB: A version of Configuration PVSS db with all hardware structure and working parameter has been created on devdb for W+2. Next step is to move on OMDS db.

  • Condition DB: More hardware information added on db from hw point of view, optimized thresholds for main channels parameter (Vmon, Imon, I0,V0,status,temp) and from hardware component (Board temperature, FSM status, HW status)

  • Regarding OMDS db resources, the idea is to use a common db only for PVSS data, both for configuration and condition.

  • Additional table and view to simplify and speed up the communication with external software.

Giovanni Polese


Conclusion
Conclusion

  • The entire system fully responses to the last version of the official CMS DCS guidelines, required for the integration to the Central DCS.

  • First PVSS DCS application version for W+2 available when the final hardware configuration will be ready (after cabling T sensor ~ 1 week). Ready to be used from not expert from the second half of May.

  • Global DCS commissioning is foreseen from the half of Jun.

  • Regarding Endcap, no upgrade has been done from the MTCC for qualified manpower missing.

Giovanni Polese


Hv cabling
HV cabling

  • multiconductor connettorization (600 ch):

    • pretest and fixing: 1 month * 2 people 8 K€

    • connectorization: 2 months * 2 people  20 K€

    • HV cable-distrib: 1 month * 2 people  8 K€

  • people involved up to now:

    • G. Passeggio, F. Cassese, A. Vanzanella

    • A. Cimmino and P. Noli

  • HV Patch Panel connection: 2 weeks * 2 people

Giovanni Polese





Lv cabling
LV cabling

  • tower and tower-tower cabling

    • installation: (1 week * 2 people)/wh  5 weeks

    • LV test: (1 week * 2 people)/tw  10 weeks

    • temp test: (1 week * 2 people)/wh.  5 weeks

  • Infrastructure cabling and test

    • (1 week * 2 people)/wheel  5 weeks

Giovanni Polese


Hv lv components status
HV & LV components status

Log scale

Giovanni Polese


Components numbers
Components - numbers

Late delivery

To modify

Late delivery

Giovanni Polese