An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDC2-TCC2 consolidationstatus report to EATM 10.12.2013 In sharepoint: https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/

  2. 2013 planning Goal end 2013: 6 hot items out of the way.

  3. Removal of hot items • Removal of hot items from the worksites: • TCSC removed first and brought to B.955 • 3 splitter2 magnets and 2 MDLV removed and stored in TDC2

  4. Removal of hot items 3 splitter2 magnets 2 MDLV magnets

  5. Splitters in W49

  6. MDLV in W50

  7. Dose planning

  8. 2014 Planning Operation Worksite Op. Worksite