1 / 11

Vacuum cable evaluation for endcap feedthroughs

Vacuum cable evaluation for endcap feedthroughs. Ten prototype vacuum cables were received in November from FCI/Berg for testing and evaluation. Line impedances all within specifications. 4 out of 10 cables passed as calibration quality in resistance test

lacey
Download Presentation

Vacuum cable evaluation for endcap feedthroughs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vacuum cable evaluation for endcap feedthroughs Ten prototype vacuum cables were received in November from FCI/Berg for testing and evaluation Paul Poffenberger University of Victoria

  2. Line impedances all within specifications Paul Poffenberger University of Victoria

  3. 4 out of 10 cables passed as calibration quality in resistance test (specs called for 2 out of 30) Paul Poffenberger University of Victoria

  4. Calculated line attenuation from measured resistance and impedance Paul Poffenberger University of Victoria

  5. Crosstalk from interconnecting cables is subtracted Paul Poffenberger University of Victoria

  6. Corrected crosstalk for all ten cables Paul Poffenberger University of Victoria

  7. Asymmetric orientation of cable knees Paul Poffenberger University of Victoria

  8. Cold flange rotation: clockwise counterclockwise Approximately 3 cm gained in flange-to-flange spacing Paul Poffenberger University of Victoria

  9. Insertion model is completed Paul Poffenberger University of Victoria

  10. Endcap feedthrough production database • QC data sheets have already been developed for this project. A database has just recently been written, but not yet implemented. • Inventory of parts will be tracked, as well as test results (simple dimensions, vacuum tests, electrical tests, etc) for each part, subassembly, and full assembly. Which parts end up in each assembly is also tracked. All information is kept both in QC data sheets as well as in the database. Paul Poffenberger University of Victoria

  11. Information will be entered by the technician or physicist responsible for the particular task in question (receiving parts, testing parts, etc.). For the database, forms are made to reflect each of the relevant tasks, eg, a `pincarrier leaktest' form will exist for the particular task of leaktesting each pincarrier upon arrival from the manufacturer. • Whenever possible, serial and batch numbers will be used if provided by the manufacturer. For those types of parts that do not arrive with serial numbers, we will provide our own. Paul Poffenberger University of Victoria

More Related