An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meter Read Validation 11th August 2014

  2. Background • The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of Modification 0432. • The new read validations and tolerances are documented in the ‘Uniform Network Code Validation Rules’ • Concerns have been raised that the read validation tolerances may not be appropriate, particularly for Smaller Supply Points • British Gas delivered a presentation at the 31st January 2014 Project Nexus meeting highlighting some issues with the current proposed tolerances • Further analysis was carried out by British Gas and by Xoserve • The following slides provides proposals for changes to the tolerances

  3. Summary of the Issues Identified • The tolerances for SSPs in Class 4 will not allow for a read that produces a zero consumption to be accepted without the ‘Override Flag’ • Market Breaker Tolerances for all Classes for larger Supply Meter Points appears too high, particularly for DM Supply Meter Points • Where the AQ has reduced over a period of time due to low consumption and the Supply Meter Point starts consuming again, the current tolerances may prevent a read from being loaded • Scenario generally applies to SSP’s that are ‘vacant’ • High consumptions due to the ‘Through the Zero’ count not being populated on the read file

  4. Financial Values for Class 2 & 3 The figures in the following slides are indicative only, based on the latest version of the UNC Related document, and use estimated values for Load Factors (to calculate SOQs) and SAP prices. It is designed to illustrate the largest values which might be expected to pass within the market breaker upper tolerance test, however actual outcomes may differ in practice.

  5. Financial Values for Class 4 The figures in the following slides are indicative only, based on the latest version of the UNC Related document, and use estimated values for Load Factors (to calculate SOQs) and SAP prices. It is designed to illustrate the largest values which might be expected to pass within the market breaker upper tolerance test, however actual outcomes may differ in practice.

  6. Xoserve Recommendations • For all Classes and all Supply Points allow zero consumption reads to be submitted without the need of the Override Flag • Lower the Market Breaker upper tolerances, especially for Class 2 as currently allows a daily read to be accepted that is 7 x the SOQ • For Class 4 SSPs have a Override Read Tolerance high enough to allow reads in following period of very low or zero consumption • Make the ‘Through the Zero’ (TTZ) count mandatory on all read files

  7. Tolerances for Daily Reads Documented in the Settlement BRD Tolerances for a daily read received following an actual read

  8. Proposed Tolerances for Daily Reads (Classes 1, 2 & 3) Tolerances for a daily read received following an actual read

  9. Tolerances for Periodic Read (Class 4) Documented in the Settlement BRD Tolerances for a periodic read received following an actual read

  10. Proposed Tolerances for a Periodic Read (Class 4) Tolerances for a periodic read received following an actual read

  11. Next Steps • Shippers to check the proposed tolerances on a sample of Meter Points • At the September meeting review the tolerances and results of Shipper analysis • Update tolerances where required • Update Settlement BRD • Update UNC Validation Rules and submit for approval