WORLD BANK EAST AFRICA PUBLIC HEALTH LABORATORY NETWORKING PROJECT Interim Report for Baseline Assessments Using WHO-AFRO Checklist Rwanda 21 Nov to 02 Dec 2011. Names of assessors. Ms. Zaynab Yahya Mfaume – PHLB-MoHSW Tanzania Mr. Hussein Abdi Farah – EAPHLN- Kenya

kylene
Download Presentation

Names of assessors

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WORLD BANKEAST AFRICA PUBLIC HEALTH LABORATORY NETWORKING PROJECTInterim Report for Baseline Assessments Using WHO-AFRO ChecklistRwanda21 Nov to 02 Dec 2011

  2. Names of assessors • Ms. Zaynab Yahya Mfaume – PHLB-MoHSW Tanzania • Mr. Hussein Abdi Farah – EAPHLN- Kenya • Ms. Christine N. Korsah – NTRL Uganda

  3. INTRODUCTION The Lab networking and accreditation working group was established to: • Guide the East African region towards development of common standards by standardizing quality assurance systems. • Apply WHO/AFRO 5-step Quality improvement process leading to accreditation of the laboratories in the network. • Introduce peer review mechanisms.

  4. ASSESSMENT OBJECTIVES • To determine the baseline quality of laboratory services at the project sites using the WHO-AFRO checklist • To help sites to identify gaps that needs to be addressed to meet the requirements for accreditation • To assist the laboratories in developing quality improvement plan to address the gaps.

  5. FACILITIES ASSESSESSED • National Reference Laboratories (NRL) – Kigali • Gisenyi District Hospital • Gihundwe District Hospital • Kibungo District Hospital • Nyagatare District Hospital • Byumba District Hospital

  6. Method of Assessment • Questioning management and staff • Examination of records • Examination of suitability, maintenance, calibration and use of equipment. • Discuss with the supervisor and management • Observations and witnessing

  7. WHO Checklist

  8. Baseline Assessment Results

  9. Rwanda Laboratories

  10. General Commendations • Well organized assessment program and schedules by the host country • Availability of Laboratory infrastructure • Availability of Qualified laboratory staff • Interviewed staff were open and cooperative • Availability of functioning equipment • Reliable power supply (Standby Generator) • Well renovated Bacteriology sections in 4/5 satellite labs

  11. General challenges • Limited space especially in NRL • Laboratory managers were not members of the hospital management team • Poor or no Quality Management systems • Mixing up of incompatible sections (NRL, Byumba & Gisenyi) • Safety issues were not observed • Pre-analytical stage was not properly followed for (Gisenyi and Nyagatare) • Organogram were not in place

  12. Recommendations • Address limited space and separate incompatible sections • Safety issues should be enforced • Laboratory managers in the satellites should be made members of the hospital management team • There must be Quality Management System in place • Organogram should be created and displayed • Training of staff in QMS and Safety

  13. Conclusion • All laboratories should prepare action plans to address the identified gaps. • Laboratories should use the EAPHLN opportunity optimally for improvement of the quality of the laboratory services.

  14. MURAKOZE CYANE MURABEHO