1 / 11

Transport in our district

Transport in our district. (The 15th district of Budapest called Újpalota). Mr Ferenc Práth, the chief-engineer at the local authority. Our students in the office of the chief-engineer responsible for the transport system in our district.

kylee
Download Presentation

Transport in our district

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transport in our district (The 15th district of Budapest called Újpalota)

  2. Mr Ferenc Práth, the chief-engineer at the local authority Our students in the office of the chief-engineer responsible for the transport system in our district

  3. A new transport concept is being put together these days The steps of it: • A schedule at the local authority with the deadlines • A call for a tender • Choosing the engineering company • They make a plan • Starting of the check-ups with the supervising authorities (local associations and authorities in Budapest)

  4. 6. Putting the development plan, the concept together (first version) 7. It is put on the webpage of the local authority and they wait for the opinions, remarks of civil organisations 8. Summerizing the different opinions (sometimes they are accepted, sometimes they aren’t) 9. the body of the local authority officially accepts the development plan and it becomes a regulation (in October)

  5. The content of the development plan • The description of the actual state (problematic areas) • The expected developments, investments and their needs (land, public transport…) • The suggested developments in public transport, in roads, in pedestrian zones…

  6. Problems in our district • It is bordered by railway lines from two sides

  7. The map of the 15th district A motorway (M3) divides it into two parts

  8. Other Problems: There are few ringroads and wide roads coming out of the city Consequences: a lot of traffic jams on them and too many heavy vehicles

  9. Problems with public transport • There is just one tram line in our district • There are only 7 buslines • We don’t have a connection with the underground lines at all (It was planned in the 1970s and it was promised last year with the building of the 4th underground line)

  10. Urgent needs • 8 kilometres of dirt road in the district (They must be bitumenized.) • Roads in very bad conditions (Problem: all roads where there is public transport are maintained by the Budapest local authority but we suffer from the problems.)

  11. Cycling • There are two very short cycling routes coming from nowhere and going nowhere. • We cannot expect any developments in the near future and maybe in the distant future either.