Report from IEFC

Report from IEFC. IRFM 2-Sep-2009. E. Jensen. IEFC 21-Aug-2009. I reported on the measurement of the RF bypasses, stating that we don’t have indication of a conceptual weakness. It was decided to lift the self-imposed ban to limit intensity for n-TOF.

kolton
Download Presentation

Report from IEFC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report from IEFC IRFM 2-Sep-2009 E. Jensen

  2. IEFC 21-Aug-2009 • I reported on the measurement of the RF bypasses, stating that we don’t have indication of a conceptual weakness. It was decided to lift the self-imposed ban to limit intensity for n-TOF. • Simone gave a full report of issues treated in FOM over the last 2 months; the only RF issue repeated here were problems with PSB C02, which as M. Haase confirms were minor. • L. Bruno detailed the Isolde robot issues. • Preparing for the retreat, Y. Kadi gave an HIE-Isolde resource estimate: For the 5 years of phase I (replacement of Rex by a SC Linac), 89 FTEy and 27 MCHF are estimated for the Linac and Infrastructure, 40 FTEy and 2.7 MCHF Safety and the DS of Phase II. 1st IRF Meeting

More Related