An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A reminder of the outstanding action list:- • Implement central repository for drawings • – need detector information to add to official drawing • Instrumentation for absorbers must be specified and incorporated into design (temperature sensors, liquid level sensors, …) • Understand QC requirements for absorber windows and assign oversight responsibility; • Check minimum gap between AFC & Tracker solenoid Module; • -- Also check for bolting to floor in various steps; • Continue working to define worst-case magnet forces and collect magnet design notes into design report; • Define absorber heater implementation; • Revise absorber vent pipe size to make it adequate for He case • Get RAL seismic design criteria and verify that designs meet them

  2. Evaluate stresses at module interconnect flanges and bolts • Define RFCC module tie-in to rail system • Work out gusset arrangement to transfer CC forces to RFCC module vacuum shell. • Evaluate the need for redundant LH2 relief paths • Evaluate merits of cryocooler heater vs. 3-stage cooler w/o heater • Revisit absorber operational scenarios (cool-down time ≈40 hours) • Evaluate absorber heat load with more realistic assessment of surrounding temperatures (is proposed MLI adequate?) • Finalize interface between radiation shield and detector module • - must forces be transmitted? • Consider participation in KEK and/or Fermilab absorber tests (some coordination maybe called for) • Evaluate magnet interaction during quench • - does one quench induce others? • Raise Change note on the radiation shield design

  3. Status of Progress