Tf vss activity 4 intro andr s kov cs akov@niif hu
Download
1 / 5

- PowerPoint PPT Presentation


  • 112 Views
  • Uploaded on

TF-VSS Activity 4 intro Andr ás Kovács, <akov@niif.hu>. Athens, Greece 22/02/2007. Activity 4 goals. “High level technical plans…” Agree on technical aspects Define implementation phases Preparation of D4.1 Depends on Activity 3 D3.1 (Service specification) Brain storming

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - knut


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Tf vss activity 4 intro andr s kov cs akov@niif hu

TF-VSS Activity 4 introAndrás Kovács, <akov@niif.hu>

Athens, Greece

22/02/2007


Activity 4 goals
Activity 4 goals

  • “High level technical plans…”

    • Agree on technical aspects

    • Define implementation phases

    • Preparation of D4.1

  • Depends on Activity 3 D3.1 (Service specification)

  • Brain storming

  • This presentation:

    • Basics from GN2 Y3 planning + some more detail added

    • Kick-off A4 discussion

NIIF– http://www.niif.hu


Eu vc service constrains
EU VC service constrains

  • Based on:

    • Standards: H.323/SIP

    • GDS (ENUM?)

  • Central website:

    • Scheduling interface (MCU service)

    • Federative authentication framework

    • Localisation + time zone handling

NIIF– http://www.niif.hu


Eu vc service scheme
EU VC service scheme

AAI, HTTP

E-mail

Periodic

Resource Report

Central Service Elements

Status()

Reservation()

Modify()

Delete()

Agent

Agent

MCU

MCU

Domain/NREN2

Domain/NREN1

NIIF– http://www.niif.hu


Eu vc service scheme1
EU VC service scheme

AAI, HTTP

E-mail

Periodic

Resource Report

Central Service Elements

Status()

Reservation()

Modify()

Delete()

Agent

Agent

VCR

GW

MCU

MCU

Domain/NREN2

Domain/NREN1

NIIF– http://www.niif.hu