An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHRIRAM FOUNDRY LTD.MACHINE SHOP JAN . 2012

  2. TEAM MEMBER:- • Mr. R.R.NERLEKAR.(I/C Pulley line) • Mr.S.R.HIREMANI.(I/C Hub Line) • Mr.G.M.SHAIKH (Tooling) • Mr.S.B.PATIL ( Quality) • Mr.P.P.Patil ( System)

  3. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 266.0

  4. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 190.0

  5. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 476.0 Component under production

  6. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 800.2(Double decker) Component under production

  7. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 145.0

  8. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 771(Double decker)

  9. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET FRONT HUB - 10009730 Component under production

  10. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET ROTTER - 10009996 Machine utilized for nut plate..

  11. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019828 (335 SERIES) Component under production

  12. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019717 (Spline Hub)

  13. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019817 (ADBHub)

  14. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CUMMINS – Nut Plate(400/100) No schedule

  15. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Front Axle support 1800 nos SRFM &1200 nos job 1st & 2nd set up done at kol axle& Alka engg.

  16. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Nabe 1975457 108 nos ready for dispatch customer informed dispatch not required.

  17. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Nabe 2222845

  18. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 9716 Note:- To calculate labor cost take 35% overhead on Basic+DA

  19. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 9727 Note:- To calculate labor cost take 35% overhead on Basic+DA

  20. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 9730 Note:- To calculate labor cost take 35% overhead on Basic+DA

  21. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 3845 SOMT INSERT & CARBIDE DRILL Ø12.5 & ADAPTER TOTAL RS. 11990 TOOL COSR RS. 38.44 Note:- To calculate labor cost take 35% overhead on Basic+DA

  22. COST DETAILS(ITEMWISE) PART NAME & NUMBER:-CONMET ROTTER 9996` Casting to Finish Casting to Finish CNMG INSERT PROBLEM Note:- To calculate labor cost take 35% overhead on Basic+DA

  23. COST DETAILS(ITEMWISE) PART NAME & NUMBER:-CONMET ROTTER 9970 Ø 4.4 Carbide Drill Breakage & Surface finish Problem Note:- To calculate labor cost take 35% overhead on Basic+DA

  24. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CUMMINS – NUTPLATE (100/400) ASMR 02 Holder & ASML 01 Holder Rs. 13500 Tool Cost Rs. 42.58 Note:- To calculate labor cost take 35% overhead on Basic+DA

  25. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – NEB HUB 2222845 Note:- To calculate labor cost take 35% overhead on Basic+DA

  26. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – NEB HUB 5457 Note:- To calculate labor cost take 35% overhead on Basic+DA

  27. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 189 /190 Note:- To calculate labor cost take 35% overhead on Basic+DA

  28. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 800.2 Rough grooving resharp insert stock complited,new insert under trial cost planned 230 RS per job. TTER -2525 Holder Rs. 4500 & PDJNR -2525 Rs. 1500 Tool Cost Rs. 326.44 Note:- To calculate labor cost take 35% overhead on Basic+DA

  29. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 413 Note:- To calculate labor cost take 35% overhead on Basic+DA

  30. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 642 Note:- To calculate labor cost take 35% overhead on Basic+DA

  31. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 476 Note:- To calculate labor cost take 35% overhead on Basic+DA

  32. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Front Axle Support ( JD FAS ) Note:- To calculate labor cost take 35% overhead on Basic+DA

  33. MACHINE UTILISATION IN % (VTL – NOV 11) Pulley Pulley

  34. MACHINE UTILISATION IN % (CNC – NOV 11) HUB Pulley

  35. MACHINE UTILISATION IN % (CNC - NOV 11) ROTTER/NUTPLATE Pulley

  36. MACHINE UTILISATION IN % (VTL – VMC –NOV 11) HUB HUB

  37. MACHINE UTILISATION IN % (VTL – VMC –DEC 11) JD Line

  38. Majour Losess Details (Whole shop)

  39. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10019730 PRD- 191 NOS,, PRD- 184 NOS,, IN H MR 1.09% (2) ***ACTION ON MAJOR REJECTION CAUSES

  40. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET HUB 9717 PRD- 179 NOS, IN H MR 2.23% (4), ) (IN THIS REJECTION 3 NOS EJECTED FOR HOLE 24.86 TOOL MARK) SF MR 1.68 % (3) ***ACTION ON MAJOR REJECTION CAUSES

  41. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET HUB 9817 PRD- 987 NOS, IN H MR- 3.04% (30) –( IN THIS 10JOBS ARE REJECT IN DIA 160.248 O/S , 4 JOBS IN 5/16 TAPPING WALLSHIFT & 3 JOBS IN 24.86 OUT CUT) SF MR - 1.32 %(13) –( IN THIS 6JOBS ARE REJECT IN DIA 139. TOOL MARK , 4 JOBS IN DIA 152. TOOL MARK) PRD- 327 NOS, IN H MR-4.89% (16) –( IN THIS 5JOBS ARE REJECT IN HOLE 24.86 TOOL MARK & 3JOBS IN 5/8 WALLSHIFT) SF MR – 1.53%( 5) ***ACTION ON MAJOR REJECTION CAUSES

  42. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET HUB 9828 PRD- 159 NOS, IN H MR- 3.14% (5) ***ACTION ON MAJOR REJECTION CAUSES

  43. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET ROTTER 9996 PRD- 1267 NOS, IN H MR 0.63% (8 ) SF MR 0.79% (10 ) ( 8 JOBS REJECTED IN HOLE 13.47 WALLSHIFT) PRD- 610 NOS, IN H MR 1.64% (10) (IN THIS REJECTION 5 JOBS REJECTED IN HOLE 13.47 WALLSHIFT) SF MR 0.33% (2) PRD- 432 NOS, IN H MR 2.31% (10 ) ( IN THIS REJECTION 6JOB REJECTED IN HOLE 13.47 WALL SHIFT) ***ACTION ON MAJOR REJECTION CAUSES

  44. REJECTION DETAILS(ITEMWISE IN %) Part Name:- PULLEY 800.2 PRD- 68NOS,, PRD-290 NOS,, IN H MR 1.03 % (3), ***ACTION ON MAJOR REJECTION CAUSES

  45. REJECTION DETAILS(ITEMWISE IN %) Part Name:- PULLEY 476 PRD-419 NOS,, IN H MR 0.24 % (1), PRD- 379NOS, ***ACTION ON MAJOR REJECTION CAUSES

  46. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 190.0 PRD- 382NOS, ***ACTION ON MAJOR REJECTION CAUSES

  47. REJECTION DETAILS(ITEMWISE IN %) Part Name:- ECC HUB 790/791/858.1/859.1 PRD- 684NOS,, IN H MR 5.40 %(37) SF MR 0.29 % (2) (36 NOS OF HUB 790.1 rejected in broaching angle fire.) PRD- 884 NOS,, SF MR 3.73% ( 33) REJECTED BY Padmavati Engg. PRD- 972NOS,, IN H MR 0.20 %(2) SF MR 0.10 % (1) ***ACTION ON MAJOR REJECTION CAUSES

  48. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 266 PRD- 231 NOS, IH MR – 0.43 %(1). PRD- 78 NOS, IH MR – 1.28 %(1). ***ACTION ON MAJOR REJECTION CAUSES

  49. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 771 PRD- 340 NOS, PRD- 334 NOS, IH MR – 0.30 %(1). ***ACTION ON MAJOR REJECTION CAUSES

  50. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Pulley 145.3 PRD- 372 NOS, PRD- 408 NOS, IH MR – 0.49 %(2). ***ACTION ON MAJOR REJECTION CAUSES