An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API 6A 21st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19th 2014

  2. Introduction • TG Committee consists of 84 members • Meetings started in June 2013 with typically 30-35 members per meeting • Held approximately 14 WG meetings to date • TG approach • Build worklist (cut-off for items was August 2013) • Identify Teams and Team Captains • Divide worklist between teams • Meet as teams to resolve work items • Bring teams output back to general meeting for resolution

  3. Work Teams/Captains • Design / Jean Brunjes • Materials, Welding and Cladding / Sterling Lewis • Organization / Eric Wehner • Qualification / Tom Lambert • Quality / Mike Briggs • Documentation Specialist / Jill Bell • Co-Chairs / Eric Wehner & David Zollo

  4. Worklist • Currently there are 171 items in the worklist • Major Item shortlist • Bleeder fitting qualification requirements • 6X alignment • Removal of Annex I (6AV1) • Removal of Annex H – SRRR has been submitted for TR • Ambiguous wording (consider, operating, monitor) • Cladding (FE10 vs FE5) • NACE Weld qualification alignment • Elimination of 316 Cladding • Annex F Elimination of PR1 • Removal of Retained Fluid Actuators • Define Nickel Requirements in Table 9 • Deleted Triple and Quad Valve Requirements

  5. Worklist • Several Items that are/have been challenging • Overall document organization • Alloy 625 Overlay Minimum Thickness Limit • OEC / LIF alignment • Definition of a Manufacturer • Annex M – Informative to Normative vs Other Methods • Incorporation of SC-20 Series Documents • Incorporation of HPHT methodology ( move 350F/delete 650F) • Sour Service Marking

  6. Goal • Draft ballot - Winter meeting 2015 • Final ballot – Summer meeting 2015 • Will include document reorganization