Clic Vertex Thermal Setup. 26/08/2013 Maxence CURDY. CERN PH/DT/EO. Overview. Thermo-mechanical setup progress. Stave prototype: assessment of different solutions tested, proposal for next steps. Production status. Infrastructure: - Bosh profiles: Ok.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Clic Vertex Thermal Setup' - kinsey


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
clic vertex thermal setup

Clic Vertex Thermal Setup

26/08/2013

Maxence CURDY

CERN PH/DT/EO

overview
Overview
  • Thermo-mechanical setup progress.
  • Stave prototype: assessment of different solutions tested, proposal for next steps.
production status
Production status

Infrastructure:

- Bosh profiles: Ok.

- Polycarbonate walls: Machining.

- Joints: Ok.

- Junction rectangle/cylinder: Ok.

- Small mechanical parts: Machining.

- Fan: Ok.

- Flow Meter: Ordered.

- Data Acquisition (DAQ): Ok.

Everything has been stored in the building 187

fan cone
Fan + cone

It's just assembled for the picture, not mounted.

slide7

What remains to be done ?- Machining last parts. - Machining /assembly the box. - Water jet cutter  wait the plate for welding the cone.- Supply the fan.- Assembling all setup. - Heaters Contact with MINCO or Wolfgang. - Ordered Pt1000 sensor Farnell or Radiospares.- Stave fixation.

Production status

stave
Stave

3 4 5 6 7 8

Weight for 280mm  6.7g 3.5g 2.38g 3.08g 2.77g 1.51g