Muon Shutdown meeting February 14, 2011. Burkhard Schmidt. Work done in week 6 (Feb ruary 7-11 ). Gas system : S oftware upgrade took place on Tuesday and went smoothly. Membrane in the pump module has been changed on Friday.  DSS alarms have bneen disabled for both interventions.

ketan
Download Presentation

Muon Shutdown meeting February 14, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon Shutdown meeting February 14, 2011 Burkhard Schmidt

  2. Work done in week 6 (February7-11) • Gas system : • Software upgrade took place on Tuesday and went smoothly. • Membrane in the pump module has been changed on Friday. DSS alarms have bneen disabled for both interventions. • D • Chamber repair: • Chamber M5A 14A3 needed to be fixed. To reach it, M2-M5A had to be opened and chamber 14A1 had to be dismounted . . . All went well (many thanks to Nikolai) and M2-M5 A-side has been closed again. • PVSS issuesand system tests: • See piquet report by Daivde.

  3. Pending issues • M2-M5 survey: • Jean-Christophe offered to re-survey the M2-M5 A-side. Will be done tomorrow morning. • HV-settings: • Lower HV by about 50V on some regions.  To be applied still • Gas System: • Go back to nominal gas mixture for the GEMs. Planned for tomorrow morning. • Data taking: • Take a long cosmic run with the Calorimeters and OT.