Palestine of University Faculty of Engineering Software Engineering Software project Prepared by :- supervised by Fawzy Al tayeb Yasmeen elbobo Eid Ramadan. Shams company. Introduction.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Palestine of University Faculty of Engineering Software Engineering Software project' - kerry-chase


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Palestine of University

Faculty of Engineering

Software Engineering

Software project

Prepared by :- supervised by

Fawzy Al tayeb Yasmeen elbobo

Eid Ramadan

Shams company

introduction
Introduction

Shams the Palestine company for computer Palestine computer and information systems was Founded in 1998 by Medhaat sha'alan .

define problem and why you selected this problem
Define problem and why you selected this problem :-

The company suffers from some of the problems that cause inconvenience for staff, customers, suppliers and these

Problems 1- large paper that we are dealing with it.

2-the accumulation of securities on the office staff.

3- the difficulty of the search and retrieval of information required.

4- The difficulty of storage management company.

5- easily the loss and damage to some of the files documents inside. and

the suitable solution and why
The suitable solution and why :-
  • Conversion of the manual system to a computerized system will facilitate the work of the company.
  • The characteristics of the system: -- 1 - easy. 2 - accuracy. 3 - speed. 4 - organizing data. 5 - Increasing the efficiency of work. 6 - Increased the company's profit.
determine the actors
Determine the actors :-

1- Director of sales.

2- Director of maintenance.

3- Director Albermjat.

4- Employees of the maintenance.

5- Employees of the sales and purchases.

project requirements
Project requirements :-

We need to analyze that project:

1) project manager

2)system analyst

3) a responsible for Official oversight and reporting

* laptop _ * MS project , Ms Visio, excel ,word processors, Stationery notes ,pens)

* mobile to commutate with project members and the company owner.

count project requirements
Count Project requirements :-

Requirements of the project is divided into two sections:

1 - Software / It is a particular software company manages and works to facilitate transactions and provide security and privacy.

2 - Hard ware / a concrete physical tools used by the company in its work .

The sale of all computers and accessories Player , Various computer's devices such as ram ,CPU ,HARD DISK ,MIC. ,COMPUTERS AND LAPTOPS ) * Maintenance and installation of all PCs, monitors and printers. * Provide advice and technical support in information technology .

feasibility study
Feasibility study :

In order to implement the project must do pre-feasibility study for all the steps that will do it and all the costs involved, there are programs and inputs such as spare Hard ware and maintenance operations, development, and after all these processes produces the output so that a small percentage of error .

these schedules show the tangible benefits and one time costs recurring costs to our project
These schedules show the tangible benefits and One –time costs Recurring costs to our project :

One –time costs worksheet

Development costs

New hardware 5000$

New software 2000$

User training 500$

TOTAL7500$

slide10
Cont

Recurring costs worksheet

Application software maintenance5000$

Incremental data storage required 200$

Incremental communications 500$

Supplies 1500$

TOTAL7200$