Welcome to the presentation of the paper Evaluation of wind farm layouts PowerPoint Presentation
Download Presentation
Welcome to the presentation of the paper Evaluation of wind farm layouts

Loading in 2 Seconds...

play fullscreen
1 / 22

Welcome to the presentation of the paper Evaluation of wind farm layouts - PowerPoint PPT Presentation


  • 61 Views
  • Uploaded on

Welcome to the presentation of the paper Evaluation of wind farm layouts Sponsored by Swedish National Energy Agency and ABB Power Technologies Stefan Lundberg. Rated power. 160 MW. Average wind speed. 9.7 m/s. Production. 600 GWh/year. Project cost. 270 million EUR.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Welcome to the presentation of the paper Evaluation of wind farm layouts' - kendall-jefferson


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Welcome

to the presentation of the paper

Evaluation of wind farm layouts

Sponsored by Swedish National Energy Agency and

ABB Power Technologies

Stefan Lundberg

horns ref

Rated power

160 MW

Average wind speed

9.7 m/s

Production

600 GWh/year

Project cost

270 million EUR

Transmission distance

21 + 34 km

Transmission voltage

150 kV AC

Local voltage

36 kV AC

Horns Ref

Karlsgårde

Horns Ref

power production steady state
Power production (steady-state)
  • Aerodynamic capture

-

  • Aerodynamic losses
  • Gear box
  • Generator (AG and PM)
  • Transformer
  • Wind turbine converter
  • Cables (AC and DC)
  • Cable compensating inductor
  • HVDC converter
  • DC/DC converter
conclusions
Conclusions
  • For the “classical” wind parks it was found that the Small AC is best for short distances, the large DC wind park is best for long distances and the large AC wind park is best in between.
  • The series connected DC wind park seemed to be very promising if the transmission distance is longer then 20km.
investment costs
Investment costs
  • Wind turbine
  • Foundation = 0.8 MEUR
  • Cables (AC and DC)
  • Cable installation = 85 EUR/m or 256 EUR/m
  • Protections
  • Offshore platform
  • Transformer
  • Cable compensating inductor
  • HVDC converter station = 0.1 EUR/W
  • DC/DC converter = 0.1 EUR/W
energy production cost1
Energy production cost

Energy production cost [EUR/kWh]

Total investment [EUR]

Mean output power [kW]

Operational hour under one year [h] = 8760 h

Interest rate = 0.07

Life time of the wind park [years] = 25

Profit in % = 10

Constant

system configurations
System configurations

Average wind speed

  • 5 m/s
  • 6 m/s
  • 8 m/s
  • 10m/s

Type of wind parks

  • Small AC
  • Large AC
  • AC/DC
  • Small DC
  • Large DC
  • Series DC

Power levels

  • 60 MW
  • 100 MW
  • 160 MW
  • 300 MW

Transmission distance:

1-200 km