1 / 19

Rail Crash Test and Scratch Resistance Solutions for Neutrality and Scalability

Explore rail solutions with crash test results, scratch resistance, impact strength, and eco-friendly material choices. Discover battery exchange and casing solutions for improved design and recycling. Analyze competitors and navigate the road ahead for ESL construction.

kelii
Download Presentation

Rail Crash Test and Scratch Resistance Solutions for Neutrality and Scalability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jan Jing Lobo David Tobias Christian Jinsheng

  2. Rail

  3. Rail

  4. Crash test

  5. Scratch resistance is great • The rail absorbs some force, could be used • Sideways locking could be a problem • Display crashes before casing (DM) Crash test results

  6. Rail solutions

  7. Backwards compatible • Battery change • Price • Scaleability • Neutrality • New locking solution • Innards arrangements General Requirements

  8. ESL Construction

  9. Material Demands • Transparency • Scratch resistance • Impact strength • Price • Flexibility • Ecology PET PS ABS PVC PC PP SB PLA PMMA Material Choice

  10. Shred and waterbath ESL goes to recycling Manual disassembly Plastics incinerated Metals are recycled Category sorting: plastics, elektronics, dangerous waste (LCD) Waste management

  11. Competitors

  12. Competitor Analysis

  13. Battery exchange solution

  14. Battery exchange solution

  15. Battery exchange solution

  16. 1 2 3 4 Battery exchange solution

  17. Casing solutions

  18. The road ahead: Divide in two groups, responsible for inner and outer design respectively. Summary

  19. Road ahead cont’d Stickers Construction Price estimates Appearance Rail integration - important! Discussion

More Related