1 / 51

Fargo Flood Control Southside Flood Protection Prairie View Estates Fargo, ND October 2, 2008

Fargo Flood Control Southside Flood Protection Prairie View Estates Fargo, ND October 2, 2008. Fargo. Moorhead. 25 th Street South. University Drive. Rose Coulee. Red River. 1997 Spring Flood – South of Fargo. Fargo. University Drive. Rose Coulee. Cass Co Drain 53.

keitha
Download Presentation

Fargo Flood Control Southside Flood Protection Prairie View Estates Fargo, ND October 2, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fargo Flood Control Southside Flood Protection Prairie View Estates Fargo, ND October 2, 2008

  2. Fargo Moorhead 25th Street South University Drive Rose Coulee Red River 1997 Spring Flood – South of Fargo

  3. Fargo University Drive Rose Coulee Cass Co Drain 53 25th Street South 1997 Spring Flood – South of Fargo

  4. Fargo Moorhead Rose Coulee Interstate 29 25th Street South Red River Cass Co Hwy 81 Wild Rice River 1997 Spring Flood – South of Fargo

  5. 25th Street South St. Benedict Cass Co Hwy 16 Wild Rice River Interstate 29 1997 Spring Flood – South of Fargo

  6. Fargo Interstate Hwy 94 Southside Flood Control West Fargo Moorhead Red River Cass Co Hwy 6 1997 Spring Flood Areas Inundated With Floodwater and Estimate of Areas Protected by Emergency Measures Interstate Hwy 29 Horace Cass Co Hwy 14 Wild Rice River Sheyenne River Cass Co Hwy 16 Red River Oxbow Cass Co Hwy 18

  7. Interstate Hwy 94 Fargo West Fargo Southside Flood Control Moorhead Preliminary 100 & 500 Year Floodplains – Red and Wild Rice Rivers Horace Interstate Hwy 29 Oxbow

  8. Provide Protection from overland flooding that threatens the majority of properties south of I-94. Prevent extensive expansion of South Fargo Floodplain and mandatory flood insurance requirement. Provide growth area, helping to keep our region’s economy healthy Southside Flood Control

  9. Southside Flood Control North Dakota State Climate Office

  10. Interstate Hwy 94 Southside Flood Control Interstate Hwy 29 Preliminary 100 Year Floodplain Horace

  11. Interstate Hwy 94 Southside Flood Control Interstate Hwy 29 Preliminary 100 Year Floodplain with Line of Protection Horace

  12. Interstate Hwy 94 Southside Flood Control Interstate Hwy 29 Horace After Project Preliminary 100 Year Floodplain

  13. Project Flood Control Methods • FEMA levees • Channel extensions • (Red River & drain improvements) • Storage inside of project

  14. Southside Flood Control Wild Rice River Levee Alternative Base Project

  15. Issues Raised With Base Alternatives • Red River & Wild Rice River impacts (Higher flood levels) • Lost storage (Concern storage impact will simply move impacts upstream) • Properties east of Hwy 81 and upstream receive no protection

  16. Southside Flood Control Wild Rice River Levee Alternative with Channel Extensions & Supplemental Storage

  17. Wild Rice River Levees Alternative – Red River Impacts

  18. Southside Flood Control Red River Channel Extension

  19. North Dakota Minnesota Red River Channel Extension Red River Typical Red River Cross-Section

  20. Moorhead Fargo Red River 1997 Spring Flood – Burritt Kennedy, Lemke and Harwood Groves Area

  21. 32nd to 40th Avenue – Floodplain Comparison

  22. Option 1 - River Side Permanent FW Option 2A/2B - River Side Combination FW

  23. Fargo Moorhead Interstate 29 Rose Coulee Frontier 25th Street South Red River Cass Co Hwy 81 Wild Rice River 1997 Spring Flood – South of Fargo

  24. Wild Rice River Area Options Option 1 – No Wild Rice River Crossing Option 1: No Wild Rice River Crossing ($5.5 Million) Option 2 (Base): Wild Rice River Crossing ($15.5 Million) Option 3: Mini-Bypass ($29.4 Million) Option 2 – Wild Rice River Crossing Option 3 – Mini-Bypass

  25. Fargo Moorhead 25th Street South University Drive Rose Coulee Red River 1997 Spring Flood – South of Fargo

  26. Southside Flood Control Fargo West Fargo 52nd Avenue Horace University Drive Existing 100 & 500 Year Floodplains – Red and Wild Rice Rivers

  27. Southside Flood Control Fargo West Fargo 52nd Avenue University Drive Preliminary 100 Year Floodplain – Red and Wild Rice Rivers

  28. Insurance is required if: You carry a federally backed mortgage and your home or business is in a high risk area - such as: 100-year floodplain Special Flood Hazard Area or SFHA Area flooded by 1% annual chance flood Flood Zones A, AE, A1-30, AO, & AH National Flood Insurance Program

  29. Fargo Southside Flood Control Flood Insurance High Risk Premium Table Horace

  30. Fargo Southside Flood Control Flood Insurance Moderate to Low Risk Premium Table Horace

  31. Fargo Moorhead Interstate 29 Rose Coulee Frontier 25th Street South Red River Cass Co Hwy 81 Wild Rice River 1997 Spring Flood – South of Fargo

  32. Burritt-Kennedy Sand Bag Levees River Level 37.18 ft 4-5-06

  33. Burritt-Kennedy Sand Bag Levees River Level 37.18 ft 4-5-06

  34. Burritt-Kennedy Sand Bag Levees River Level 37.18 ft 4-5-06

  35. Burritt-Kennedy Sand Bag Levees River Level 37.18 ft 4-5-06

  36. Burritt-Kennedy Sand Bag Levees River Level 37.18 ft 4-5-06

  37. Burritt-Kennedy Emergency Earth Levees River Level 37.18 ft 4-5-06

  38. Burritt-Kennedy Emergency Earth Levees River Level 37.18 ft 4-5-06

  39. Burritt-Kennedy Emergency Earth Levees River Level 37.18 ft 4-5-06

  40. Burritt-Kennedy Sand Bag Levees River Level 37.18 ft 4-5-06

  41. Southside Flood Control SE Cass Preliminary Assessment District Boundary

  42. Southside Flood Control

  43. Southside Flood Control

  44. Water Resource District Assessment District Process • Send ballots to all property owners on assessment list. • (One ballot per parcel owned) • Conduct a project hearing • Ballots returned by mail • Count all ballots returned • (Weighted by amount you pay) • If more than 50% of ballots returned vote yes • Project proceeds

  45. Preliminary Assessment Analysis Completed by Southeast Cass WRD Reassessment of Benefits As the undeveloped properties in the assessment district get developed, the WRD can reassess the benefits so all properties pay for similar benefits.

  46. Southside Flood Control Wild Rice River Levee Alternative with Preferred Alignments

  47. Project Schedule

  48. Southside Flood Control Comment Sheet

More Related