1 / 21

The Scenario as it developed Broadband Communication needs Spectrum Assessment C onclusion

T rain Crash Scenario - a draft spectrum assessment example - MESA User needs and scenarios drive spectrum requirements by Steffen Ring Chairman Project MESA Steering Committee www.projectmesa.org. The Scenario as it developed Broadband Communication needs Spectrum Assessment C onclusion.

kedem
Download Presentation

The Scenario as it developed Broadband Communication needs Spectrum Assessment C onclusion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Train Crash Scenario- a draft spectrum assessment example -MESAUser needs and scenarios drive spectrum requirementsbySteffen RingChairman Project MESA Steering Committeewww.projectmesa.org

  2. The Scenario as it developed Broadband Communication needs Spectrum Assessment Conclusion

  3. A massive train accident in one of the largest cities in the world. A high-speed passenger train and a freight train pulling numerous tank cars of propane and hydrochloric acid have been switched onto adjacent tracks. The center track closed for rail replacements. The scene is set for disaster. And it gets worse... Scenario

  4. A new sports stadium build upon land reclaimed from a cleaned-up waste site parallels the three sets of railroad tracks that are in daily use for commuter, freight and high-speed passenger operations. It is late Saturday afternoon. A steady 20 MPH wind is blowing right into the stadium from the direction of the tracks. 65000 people is watching the football game. Parking lots are full. A concert and fireworks show is scheduled for later..... The situation

  5. The northbound passenger train approaching the stadium on the inside track. 10 cars, 400 passengers, dual-tandem engines. Speed 100 Km/h. The southbound freight train is rolling through with 4 cars of hydrochloric acid and 8 cars of propane. Total 121 carspulled by 5 engines in tandem, speed 45 70 Km/h. Behind the stadium the freight train is unexpectedly switched to the center track .... The entire event unfolds in less than a minute: First engine reaches the point where the track has been removed. Five diesel locomotives leave the track pulling 16 cars with them. Acid leaking out producing a deadly fog blowing into the stadium. Propane cars remain upright. Engineer of the passenger train is helpless. Engineand 5 passenger cars leave the track. Impact is deadly..... Football game stopped. Panic breaks out on the entire stadium... 10.000+ cell phones try to call for help at the same time......... The Event

  6. Mobile Ad-Hoc Network” The Moving Hot-Spot” Backhaul Link • Full C3 @ scene: • Command • Control • Communication Master Node UPLINK

  7. Hot-spot area: 1 Km2 No of Paramedical EMS staff: 120 40 ambulances shuttelling No of HazMat Staff: 18 Firefighters: 25 5 Trucks Rescue Squad Members: 50 5 Robots deployed for wreckage inspection Law Enforcement Officers: 35 Broadband spectrum assessmentExample2:Train Disaster BASIC BROADBAND SCENARIO PARAMETERS • No of MESA Robots: 5 • Streaming Video Visible Light (MPEG4) • Control Carrier • Air Surveillance by video • Ground Transport Logistics • Road access and route assistance Crash Area 1 cell: Circular, r = 500 m

  8. 1) No of active Streaming Video units: 45 (+ 5 Robots with Cameras) 2) EMS Still Picture sequencing units: 50 units 3) Fingerprint Scanning: 20 Units 4) IP Voice Streaming Some relevant applications The M.1390 Methodology calls for separate calculations of spectrum requirements, Uplink and Downlink, application by application. In typical ”hot-spot communications” the upink (information sent FROM the hot-spot)will be the most busy. In this draft example we shall therefore only consider the uplink requirements, and for clarity only calculate 1) and 2)

  9. Online Video streaming (MPEG4 Compression @ 700 kBPS Stills from scene (Patients) (JPEG @ 250 kBytes) Online IP Voice streaming (@20kBPS) Fingerprint Scanning remote matching 500 dpi (AFIS Standard from Police/Law Enforcement) 8 bit dynamic range (256 Gray-scale resolution) Image 1 x 1 Inch : File size 2 Mbit uncompressed Broadband Communication Applications- typical data speeds to accomodate - From Fingerprint To Mugshot

  10. Emergency and Medical Services (EMS)Remote Patient Monitoring Frontline Medical Assistance by Broadband Wireless Networking: Videoand Image Sequencing Electro Encephalographic data (EEG) Electro Cardiograph (ECG) Blood Pressure Temperature Bit-rates saves lives

  11. Mobile Robotics • Automated inspection of non-accessible areas • Rescue of people from hazardous areas • Anti terrorist actions • Incident response both tactical and non-tactical • Urban warfare • Haz-Mat Handling • Airborne control

  12. Fterrestrial - the weighted summation of co-existing individual spectrum components Fes [MHz] Here we consider Fes as the sole component required to host the PPDR Broadband requirements as outlined in these examples Tes Fes = [MHz] , Ses The basic equationsRec. ITU-R M.1390 Σ αes FTerrestrial = β Fes Where Tes[Mbit/s/cell] is theTraffic pr Cell, and Ses [Mbit/s/MHz/cell] is the net system cell capacity

  13. Geographic ConsiderationsUplink calculation Streaming Video 1) Selection of ”e” – environmental type: Combination of Density and Mobility ”e” Dense Urban 2) Cell geometry: Circular, r = 500 m, Cell_Areae = 1 Km2 3) Service type ”s” = High Multimedia, Packet Switched Net_User_Bit_Rates = 1000 kbit/s (MPEG4 streaming @700 kbit/s) + overhead. 4) Population Density, All Units Operating: Pop_Densitye = 50 [Km-2]

  14. Geographic and Market ConsiderationsUplink calculation Streaming Video 5) Penetration Rate, is 100 % as all potential users are active, so Penetr_rate = 100 % or = 1 6) Users per cell Users/Celles = Pop_Density * Penetr_rate = 50

  15. Traffic ConsiderationsUplink calculation Streaming Video 7) Busy_Hour_Call_Attemptss = 1, For Packet Switched systems defined as number of sessions 8) Call_Duration = 3600 [s] or 1 [E] 9) Activity_Factor = 100% The precentage of time the frequency resource is used 10) Traffic/Useres = Busy_Hour_Call_Attemptss * Call_Duration * Activity_Factor = 3600 [call-seconds] 11) Offered_Traffic/Cell = Traffic/Useres * Users/Cell = 36*103

  16. Tes Fes = [MHz] , Ses Technical and System ConsiderationsStreaming Video Uplink final assessment 12) Service_Channel_Bit_Rates = Net_User_Bit_Rates * 1.5 = 1500 kbit/s The scaling factor accounts for RF channel overhead such as crypto coding And error recoverage handling 13) Anticipating 50 service channels per cell we calculate Traffic: Tes =Service_Channels/Celles * Service_Channel_Bit_Ratees= 75 Mbit/s/cell MESA technology has not been selected yet. However if we consider current avaible digital technology such as carriers of Π/4 DQPSK Offering 36000 bps @ 25 kHz (~1.5 bit/s/Hz) we get: Ses = 1.5 Mbit/s/MHz/cell = 75/1.5 [MHz] = 50 MHz uplink

  17. Geographic ConsiderationsUplink calculation EMS Still Images 1) Selection of ”e” – environmental type: Combination of Density and Mobility ”e” Dense Urban 2) Cell geometry: Circular, r = 500 m, Cell_Areae = 1 Km2 3) Service type ”s” = High Multimedia, Packet Switched Net_User_Bit_Rates = 250 * 8/5 = 400 kbit/s (1 * 250 kB JPEG image every 5 seconds) 4) Population Density, All Units Operating: Pop_Densitye = 50 [Km-2]

  18. Geographic and Market ConsiderationsUplink calculation Still Images 5) Penetration Rate, is 100 % as all potential users are active, so Penetr_rate = 100 % or = 1 6) Users per cell Users/Celles = Pop_Density * Penetr_rate = 50

  19. Traffic ConsiderationsUplink calculation Still Images 7) Busy_Hour_Call_Attemptss = 1 For Packet Switched systems defined as number of sessions 8) Call_Duration = 3600 [s] or 1 [E] 9) Activity_Factor = 100% The precentage of time the frequency resource is used 10) Traffic/Useres = Busy_Hour_Call_Attemptss * Call_Duration * Activity_Factor = 3600 [call-seconds] 11) Offered_Traffic/Cell = Traffic/Useres * Users/Cell = 180*103 [call-seconds]/Cell

  20. Tes Fes = [MHz] , Ses Technical and System ConsiderationsUplink Calculation Still Images final assessment 12) Service_Channel_Bit_Rates = Net_User_Bit_Rates * 1.5 = 600 kbit/s The scaling factor accounts for RF channel overhead such as crypto coding And error recoverage handling 13) Anticipating 50 service channels per cell we calculate Traffic: Tes =Service_Channels/Celles * Service_Channel_Bit_Ratees= 30 Mbit/s/cell MESA technology has not been selected yet. However if we consider current avaible digital technology such as carriers of Π/4 DQPSK Offering 36000 bps @ 25 kHz (~1.5 bit/s/Hz) we get: Ses = 1.5 Mbit/s/MHz/cell = 30/1.5 [MHz] = 20 MHz uplink

  21. Packet Switched Multimedia Environment Well known Collission Detection principle applied (such as CDMA/CD) Well known digital wireless technology applied such as a π/4DQPSK modulated carrier offering 1.5 bits/s/Hz No degradation in Quality of Service due to spectum congestion tolerated Ad-hoc high speed interlinking of rescue units not considered part of the applications requirements for available spectrum Conclusion Based on the assumptions below, the Rescue Team and the EMS crew assistance at the scene, some 70 MHz of uplink spectrum wil be needed for their Broad Band needs during this incident

More Related