An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cumulative Impacts James Slider November 7, 2013

  2. Overview • The challenge • Prioritization • Regulatory analyses

  3. The Challenge Since 2005, the U.S. nuclear industry has seen a substantial expansion in workload The challenge is to ensure management attention and resources are focused on areas of highest significance to safety More than ever before, NRC and industry need to work together to weigh, prioritize and implement regulatory and industry actions in an integrated manner consistent with safety significance

  4. Nuclear Utility Spending Source: Electric Utility Cost Group

  5. Nuclear Utility Spending Source: Electric Utility Cost Group

  6. Regulatory Cap Ex Spending Source: Electric Utility Cost Group

  7. Main Concerns • Company-initiated safety, security, and reliability improvements are squeezed out • Attention and resources diverted to regulatory needs of lower safety significance • Regulatory capital expenditures have increased and are unstable • NRC estimates of costs of implementation are off • Overlapping NRC actions cause rework

  8. Examples of Plant Improvements Deferred Improvements to safety injection and feedwater control systems Reactor vessel internal replacements Dry-cask fuel storage improvements deferred because of unclear and evolving NRC requirements Improvements in reactor coolant pumps

  9. Addressing Industry-Imposed Actions • INPO reviewing key processes: • Corrective action • Human performance • Work management • Understanding the focus of supervisor and manager workloads and oversight • Assessing effectiveness of industry initiatives, committees and organizations

  10. Addressing NRC-Imposed Actions • NEI offered 24 recommendations to accelerate, defer, amend or eliminate actions • Improve regulatory process • Issue definition and closure criteria • Regulatory analysis, basis and cost-benefit analyses • Prioritization and site-specific scheduling consistent with safety significance

  11. NRC Activities Commissioners’ proposed initiative, Improving Nuclear Safety and Regulatory Efficiency, using PRA insights and results to set the regulatory agenda NRC project for addressing cumulative impact of rulemaking NRC-industry working group meetings

  12. Initial Scope of Applicability • Rules and orders • Bulletins and Generic Letters • 10 CFR 50.54(f) letters • New generic safety issues and regulatory positions • Described in meeting summaries, correspondence including inspection reports, regulatory issue summaries and guidance documents

  13. Proposed Process & Template for Managing Cumulative Impact of Regulatory Actions

  14. Provisional Schedule Tabletop exercises to test prioritization guidance 4Q 2013 Amend guidance and proceed with pilot field implementation -- 1Q 2014 Input into July 2014 NRC SECY on cumulative impact Update guidance for NRC endorsement prior to industrywide implementation by end of 2014

  15. Comparison of Estimated and Actual Implementation Costs * Initial estimate was for no additional costs.

  16. Case Studies on Variance betweenNRC estimates and Implementation Costs • Studies confirm extreme variance between NRC estimates and implementation costs • Determine the causes of the high variance • Need for better and earlier definition and implementation characterization • Industry will need to apply resources earlier to provide more detailed comments on NRC estimated costs

  17. Challenges & Issues • Industry communication and coordination • Changing cultures • What is perceived as important to specialist may be of low relative safety significance • More robust questioning of new regulatory positions and requirements • Disposition of low safety significant issues

  18. Summary The number and complexity of new requirements demands a more integrated approach to managing plant improvements The goal is to do the right things, in the right order, once Industry and NRC must each do their parts to ensure the public interest in safe, reliable and economic nuclear energy is served