1 / 24

Wireless Expansion Update and 3 year plan considerations

Wireless Expansion Update and 3 year plan considerations. Greg Redder greg.redder@colostate.edu , 1-7222 Academic Computing & Networking Services 3/31/09. Agenda. Review Status 3 year plan considerations. Spring 2009 Project Review.

Download Presentation

Wireless Expansion Update and 3 year plan considerations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wireless Expansion Update and 3 year plan considerations Greg Redder greg.redder@colostate.edu, 1-7222 Academic Computing & Networking Services 3/31/09

  2. Agenda • Review • Status • 3 year plan considerations

  3. Spring 2009 Project Review • Supplemental funding was allocated for Spring 2009 upgrades in Clark and Morgan Library • One-time UTFAB funding of $180K plus University contribution of $90K • Board expressed interest in receiving a proposal to continue wireless upgrades Wireless Expansion Proposal

  4. Spring 2009 Project Review • Upgrade Clark A (all floors) to latest wireless standards and supporting high-density utilization. • Upgrade Clark C (all floors) to latest wireless standards and supporting high-density utilization. • Upgrade Morgan (all floors) to latest wireless standards and supporting high-density utilization. • Redeploy some wireless devices removed from above locations to supplement wireless in other buildings.

  5. Status • All equipment in-house. • Morgan: 90% completed. Completing this week. • Clark A: Need to mount some on the higher ceilings. Activated by end of next week. • Clark B: Cabling completed and APs mounted. Activation end of next week.

  6. Note • Easy Access Wireless deployed • No VPN necessary! • Secure and Authenticated • Docs at: http://www.acns.colostate.edu/?page=wireless • ULC (“TILT”, “Old Music”) completed.

  7. Morgan Before/After Wireless Expansion Proposal

  8. “Top 10” Wireless Expansion Proposal

  9. “Top 10” continued… • UTFAB addressed the most significant wireless deficiencies by upgrading wireless in: • Clark A • Clark C • Morgan • Remaining buildings have 100 simultaneous wireless users or less. Wireless Expansion Proposal

  10. Discussion: Establishing Priorities • Goals • Priorities • Coverage • Entire Buildings • Outdoor • Non-GA buildings • Approximate costs Wireless Expansion Proposal

  11. Goals • Provide state-of-the-art/high-speed wireless to all general assignment classrooms • Provide for next generation solutions: • Mobile apps • Mobile VOIP • Seamless transition between buildings, including outside? Wireless Expansion Proposal

  12. Priorities: • Considerations: • Problems with Education, Eddy and Plant Sciences reported via UTFAB members. • Engineering: 18 classrooms, 1072 seats – oldest wireless. • Heavy usage in Vis. Arts. Wireless Expansion Proposal

  13. Eddy: 25 rooms, 1146 seats, 27Mbits/sec wireless Wireless Expansion Proposal

  14. Education: 8 rooms/289 seats, 11Mbits/sec wireless. Wireless Expansion Proposal

  15. Engineering: 18 rooms, 1072 seats, 11Mbits/sec wireless Wireless Expansion Proposal

  16. Plant Sciences: 3 rooms 406 seats, 27Mbit/sec wireless Wireless Expansion Proposal

  17. Visual Arts: 2 room, 152 seats, 14 27Mbit/sec wireless Wireless Expansion Proposal

  18. Coverage: Entire building vs. just GA classrooms? (i.e.: Engineering, Chemistry) • Pros: • Complete and consistent coverage of a facility. • Students do spend time in labs, offices, non-classroom areas. • Cons: • Do you want to spend money on areas not as heavily concentrated with students? Wireless Expansion Proposal

  19. Outdoor Coverage? • Currently: • Area between Morgan/Clark/Lory • Monfort Quad • Water Plaza • Lory west side Wireless Expansion Proposal

  20. Outdoor coverage map Wireless Expansion Proposal

  21. Non-Academic Buildings • Lory • Others? Wireless Expansion Proposal

  22. Approximate costs (cover entire building) • 50 cents per ft2 indoor* *Based on cost for completing Morgan/Clark and recent quote for Eddy. Wireless Expansion Proposal

  23. Approximate Costs (cover only classrooms) • Per seat: $32* *Average of cost to cover Clark A and cost to cover Eddy. Not including cabling. **Per seat cost model differs with full building coverage. ***Pending physical layout Wireless Expansion Proposal

  24. Discussion and Thanks • The new wireless at Clark and Morgan is state-of-the-art. • Where to go next? • Thank you for your continued input and direction!

More Related